About Us | Press Room | My ASHRAE | Contact Us

Join ASHRAE
Join ASHRAE



AHR Expo 2009





Chilled Water System for University Campus

Print This Email This

By Stephen W. Duda, P.E., Member ASHRAE

This article presents a case study of the construction of a campus district chilled water system for Missouri State University’s campus in Springfield, Mo. This article covers the financial, energy, and engineering considerations behind the project. The final system design is presented, along with lessons learned.

Download PDF

Copyright ©2008, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.

 

Eresources