PROCEDURES FOR ASHRAE STANDARDS ACTIONS (PASA)
MAIN INDEX | ANNEX INDEX | REVISION HISTORY
The original Procedures for ASHRAE Standards Actions (PASA), dated June 30, 1994, superseded all previous documentation for communicating ASHRAE’s procedures as a basis for continuation (reaccreditation) under the ANSI Organization Accreditation Method. PASA changes must be approved by the ASHRAE Board of Directors (BOD) and ANSI.
ASHRAE publishes guidelines and the following types of voluntary consensus standards in the field of heating, refrigeration, air conditioning, and ventilation and the allied arts and sciences:
- Method of Test and Classification
- Design
- Protocol
- Rating Standards
Most ASHRAE standards are of the Method of Measurement or Test type. ASHRAE Standard Design and Standard Protocol documents receive the most use by consulting engineers and architects, requests for committee participation, public review comments, and adoption by code bodies. HVAC equipment manufacturers use all four types of ASHRAE standards. The project committee voting memberships represent a balance of interest (at minimum User, Producer, and General) so that no one category has a majority. ASHRAE standards are used by persons in all three interest categories.
ASHRAE’s standard project committees may include persons who are not members of ASHRAE (e.g., physiologists, medical doctors, chemists, etc.).
>> Return to Top <<
SECTIONS 1–3: INTRODUCTION, SCOPE, DEFINITIONS
INTRODUCTION | SCOPE | DEFINITIONS, ABBREVIATIONS AND ACRONYMS, AND CLASSIFICATIONS
1. INTRODUCTION
Founded in 1894, the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE) is a technical society of more than 50,000 members, organized and operated for the exclusive purpose of advancing the arts and sciences of heating, refrigeration, air conditioning, and ventilation; the allied arts and sciences; and related human factors for the benefit of the general public. ASHRAE sponsors a research program, develops standards, publishes technical data, and organizes meetings and educational activities for both its members and others professionally concerned with refrigeration processes and the design and maintenance of indoor environments. The Society also strives to promote increased public awareness of the requirements for healthful and comfortable indoor environments.
>> Return to Main Index | Return to Top <<
2. SCOPE
These Procedures direct ASHRAE’s standards activities in the field of heating, refrigeration, air conditioning, and ventilation and the allied arts and sciences. These Procedures apply to activities related to the development of consensus for approval, revision, reaffirmation, stabilized maintenance, withdrawal, and maintenance of ASHRAE standards, and to relations with standards-related committees of other organizations. These Procedures shall also apply to guidelines as noted.
ASHRAE leaves to trade associations the writing of rating standards unless a suitable rating standard will not otherwise be available.
>> Return to Main Index | Return to Top <<
3. DEFINITIONS, ABBREVIATIONS AND ACRONYMS, AND CLASSIFICATIONS
Annex A provides definitions, abbreviations, and acronyms and classifications of ASHRAE standards.
>> Return to Main Index | Return to Top <<
SECTION 4: APPROVAL OF PROPOSED STANDARDS
RESPONSIBILITY | STANDARDS COMMITTEE MEMBERSHIP | ESTABLISHMENT OF PROJECT COMMITTEES
4.1 RESPONSIBILITY
The Standards Committee (StdC) is responsible for the formation of project committees (PCs) and the development, preparation, interpretation, revision, reaffirmation, stabilized maintenance, and withdrawal of ASHRAE standards and guidelines. The Board of Directors (BOD) or its designee will counsel and offer guidance to the StdC on contentious issues during the development of the standards or guidelines.
Each member of the StdC is appointed to one or more subcommittees by the chair. These subcommittees are responsible for:
- Tracking the status of PCs
- Recommending ASHRAE appointments to standards-writing committees of other organizations, monitoring their activities, and maintaining ASHRAE participation in the canvass balloting activities of other standards-writing organizations
- Ensuring the timely maintenance of existing standards in accordance with ASHRAE procedures; forming interpretations committees for standards when PCs do not exist; considering requests for development of joint sponsorship agreements; and acting in coordination with cognizant PCs, ASHRAE technical committees (TCs), task groups (TGs), or technical resource groups (TRGs) to recommend reaffirmation, stabilized maintenance, or withdrawal of standards.
PCs are appointed to develop and revise standards in accordance with approved written procedures. The PCs are responsible for the technical content of standards, guidelines, and portions thereof. The StdC supervises the work of PCs to ensure that approved procedures have been followed.
>> Return to Main Index | Return to Top <<
4.2 STANDARDS COMMITTEE MEMBERSHIP
4.2.1 Standards Committee
The StdC is a standing general committee and its members are elected by the BOD. The members are selected from various interest groups to prevent dominance of any single interest and may include persons from groups such as manufacturers, consultants, educators, trade associations, government, testing/research laboratories, utilities, code bodies, contractors, consumer/users, and environmentalists. Members of the StdC must be of Fellow, Member, or Associate Member grade. Members of the StdC may be Life Members or Presidential Members.
4.2.2 Standards Committee Subcommittees
The StdC has the following subcommittees:
- Planning, Policy, and Interpretations Subcommittee (PPIS)
- Standards Project Liaison Subcommittee (SPLS)
- Code Interaction Subcommittee (CIS)
- Standards Reaffirmation Subcommittee (SRS)
4.2.2.1 Planning, Policy, and Interpretations Subcommittee (PPIS)
PPIS oversees the following:
- Maintenance and revision of all standards writing and processing procedures and policies
- Recommending approvals of new titles, purposes, and scopes
- Handling interpretations of existing standards when no PC exists
- Evaluating requests for joint sponsorships of standards and guidelines.
PPIS is comprised of StdC members only.
4.2.2.2 Standards Project Liaison Subcommittee (SPLS)
SPLS oversees the following:
- Development of standards and guidelines
- Training of PC chairs
- Work plans
- Waivers of the ASHRAE Units Policy
SPLS is comprised of StdC members only.
4.2.2.3 Code Interaction Subcommittee (CIS)
CIS oversees the participation by ASHRAE in the development of model codes and standards by other standards development organizations (SDOs) that have relevance to ASHRAE technical interests. CIS is comprised of StdC and non-StdC members with knowledge of model code development and the deployment of building regulations.
4.2.2.4 Standards Reaffirmation Subcommittee (SRS)
SRS serves as the PC for reaffirmation, stabilized maintenance, withdrawal, or nonsubstantive revisions of existing ASHRAE standards or guidelines.
SRS is a PC of at least five (5) members, including at least three (3) members of the StdC and applicants responding to an annual call for members posted in ASHRAE Standards Actions. When possible, members shall also have international standards experience. The Chair and members are appointed annually by the StdC Chair. SRS acts, in limited circumstances, as a PC for existing standards and is subject to the rules of PCs for reaffirmations, stabilized maintenance, withdrawals, and revisions only to update references, that are not themselves reaffirmations and do not cause a substantive change to the standard. SRS must comply with all ANSI requirements for openness, balance, and due process. SRS may act in lieu of a PC, with the advice of the cognizant TC/TG/TRG, to recommend reaffirmation, withdrawal, or revision of an existing standard or guideline based on updated references (that do not cause a substantive change to the standard) or add a second system of units to an existing standard, thereby making the existing standard useable in either SI or I-P units.
SRS oversees the Society’s participation in the standards work of other SDOs, the American National Standards Institute (ANSI), and ANSI’s technical advisory groups on International Organization for Standardization (ISO) and International Electrotechnical Commission (IEC) standards.
SRS is responsible for monitoring, reporting, and submitting recommendations to the StdC for the adoption of international standards activities by ASHRAE.
>> Return to Section 4 | Return to Top <<
4.3 ESTABLISHMENT OF PROJECT COMMITTEES
4.3.1 Project Committees
PCs are authorized by the StdC as either standard project committees (SPCs), which are ad hoc committees; standing standard project committees (SSPCs); guideline project committees (GPCs); or standing guideline project committees (SGPCs). PCs are the consensus bodies of the Society. If an SPC is not balanced, efforts to recruit materially affected and interested parties from diverse interest categories to become members of a nonbalanced SPC shall be ongoing and documented.
A member of the SPLS is appointed as StdC Liaison to the new PC. A call-for-members announcement is conducted. Drawing from the resulting applications and recruiting efforts, candidate committee members are recommended in consideration of their personal expertise and their effect on committee balance. Recommended members and PC chairs are approved by a majority vote of SPLS.
4.3.2 Project Committee Voting Status
PCs may have project committee voting members (PCVM), nonvoting members (NVM), project subcommittee voting members (PSVM), or consultants.
4.3.3 PC Activity Initiation
At the first official meeting of a new PC, the PC shall vote on whether to concur with or propose changes to the original title, purpose, and scope (TPS). The PC may conduct business (for example, pass motions) only after the balanced membership roster with at least five (5) voting members has been approved by SPLS. However, the PC chair may hold organizational meetings for individuals interested in becoming members of the PC, and the group may begin developing the standard or guideline.
4.3.4 PC Use of Subcommittees
The PC chair may organize the committee structure using formal subcommittees. If subcommittees are used, the chair’s recommendation for subcommittee chair must be approved by SPLS. Responsibilities of various PC subcommittees typically are to
- Develop drafts of one or more assigned clauses of a standard, annexes, or addenda;
- Prepare a system of units;
- Prepare text in appropriate language;
- Establish educational activities;
- Develop draft responses to requests for interpretation; and
- Develop proposed responses to comments resulting from public review.
Subcommittees may also be formed to draft StdC-approved standards or guidelines related to the subject matter of the parent PC. Subcommittee actions shall be submitted as recommendations for action by the parent PC.
4.3.5 Project Committee Officers
PC officers consist of a chair, secretary, and in some cases also vice chair(s) and subcommittee chair(s). The chair and any vice chairs or subcommittee chairs must be ASHRAE members. Only individual members as defined in Section 4.3.6 are eligible to serve as chair, vice chair, or subcommittee chair. The chair shall appoint a secretary and recommend a vice chair, if the size or activity of the PC warrants one.
4.3.6 PC Members
A PC shall have individual members, and designated PCs may have organizational members (OM; see Section 4.3.10). Individual members are appointed as “personal members,” not as representatives of any organization, corporation, partnership, or employer. There shall not be more than one PCVM from any one company, association, or agency.
4.3.7 Participation in Committee Activities
Each PC member is expected to attend meetings and participate in other committee activities, such as conference calls, letter ballots, email correspondence, etc. Failure to regularly do so, without an acceptable reason, shall be sufficient cause for the PC chair to recommend to SPLS removal of a person from the PC membership roster.
4.3.8 Removal for Cause
The PC Chair may recommend removal of a PC member from the roster for due cause by submitting a recommendation and justification outlining the reasons for said recommendation. The PC Chair must submit a copy of communications between the PC Chair and PC member concerning this subject with the recommendation, in writing, to the SPLS Liaison and Group Manager of Codes and Standards (GMOCS). The GMOCS will transmit the recommendations of the PC Chair and SPLS Liaison and related correspondence to SPLS for action in a meeting or by letter ballot. The SPLS Chair may call an executive session of the SPLS or the PC to discuss the matter. Failure of the PC member to properly disclose any conflict of interest shall be grounds for removal from the PC by SPLS.
4.3.9 Removal for Cause Initiated by SPLS
SPLS may, without a recommendation of the PC Chair, remove one or more PC members from the roster and document their reasons for the removal.
4.3.10 Organizational Members
Subject to approval of SPLS, the PC Chair may nominate an organization as an OM. An OM designates a representative, and at the organization’s discretion, an alternate, to serve in the absence of the representative, to participate in PC activities in the same manner as an individual member, except that the representative and alternate may not serve as a chair, vice chair, or subcommittee chair of a committee. The designated organizational representative (OR) of the OM may serve as a PCVM or a PSVM of the PC. For consideration of appointment as an OM, the organization should normally be a governmental agency, public interest group, or organization that represents a number of entities such as a trade association. Organizations such as educational institutions or corporations and partnerships engaged in commerce shall not be eligible for OM status.
Organizations are informed of the availability of organizational memberships on specific PCs by one or more of the following:
- Notice in ASHRAE Insights, ASHRAE Journal, ANSI Standards Action, etc.
- Posting on the ASHRAE Web site
- Press releases to the applicable trade press
- Direct communication to potential materially affected organizations
4.3.11 Criteria for Considering Organizational Members
The PC Chair should consider the following criteria in nominating organizations for OM status on a PC:
- The degree to which members of the organization are materially affected by the requirements of the standard
- The ability of the representative of the organization to represent the interests of the members of the organization
- The capability of the organization to provide an individual with appropriate technical or scientific qualifications to serve as their representative, and if desired, another individual with appropriate technical or scientific qualifications to serve as an alternate organizational representative (AOR)
- That an official representative of the organization has endorsed the member and the alternate to serve on the PC
- The willingness of the organization to abide with the terms of organizational membership
4.3.12 Project Committee Size
The PC shall be balanced and consist of no less than five (5) PCVMs with no upper limit, including the chair. In addition to the PCVMs, the PC membership may also include PSVMs if the PC is organized into subcommittees or NVMs if not organized into subcommittees.
>> Return to Section 4 | Return to Top <<
SECTION 5: RELATIONSHIPS WITH OTHER STANDARDS-DEVELOPING ORGANIZATIONS
GENERAL | JOINT SPONSORSHIP
5.1 GENERAL
The Standards Committee (StdC) supervises ASHRAE’s participation in the standards work of other organizations including the American National Standards Institute (ANSI) and international and regional standards organizations including the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC).
>> Return to Section 5 | Return to Top <<
5.2 JOINT SPONSORSHIP
A request to jointly sponsor a standard shall be evaluated by the StdC, considering overlap of expertise and responsibility. The evaluation must be reported to the Technology Council. A recommendation for joint sponsorship, including a recommendation for the lead organization, shall be forwarded to the Technology Council for approval and reported as an information item to the Board of Directors (BOD). A recommendation against joint sponsorship shall be forwarded as an information item to the Technology Council and the BOD.
If joint sponsorship is approved by the Technology Council, standards-writing and approval procedures must be negotiated with the other organization by the Group Manager of Codes and Standards (GMOCS) on behalf of the StdC. The standards-writing and approval procedures should be those of the lead organization. If ASHRAE procedures are not adopted, the adopted procedures must be compatible with ASHRAE procedures in regard to openness of proceedings, public review of drafts, and delegation of technical content to the project committee.
>> Return to Section 5 | Return to Top <<
SECTION 6: COMPLIANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) REQUIREMENTS FOR ACCREDITATION
Since 1976, ASHRAE has been accredited by ANSI as a developer of American National Standards and continuation of this accreditation shall be maintained based on ASHRAE procedures and practices for standards development meeting the criteria for accreditation given in ANSI Essential Requirements: Due process requirements for American National Standards (referenced hereafter as ANSI Essential Requirements or ANSI ER).
>> Return to Main Index | Return to Top <<
SECTION 7: CRITERIA FOR APPROVAL, WITHDRAWAL, AND DISCONTINUANCE OF ASHRAE STANDARDS AND GUIDELINES
INTRODUCTION | GENERAL | MAINTENANCE OF STANDARDS AND GUIDELINES | DUE PROCESS REQUIREMENTS | CONSENSUS | CRITERIA FOR APPROVAL | CRITERIA FOR WITHDRAWAL OF STANDARDS OR GUIDELINES | STANDARD PROJECT DISCONTINUANCE | FINAL NOTICE | EMERGENCY INTERIM STANDARDS ACTION | INTERPRETATION REQUESTS OF STANDARDS | INTERPRETATION REQUESTS OF ASHRAE STANDARDS DEVELOPMENT PROCEDURES
7.1 INTRODUCTION
Approval of an ASHRAE standard, guideline, or portion thereof, requires verification that the requirements for due process and consensus have been met. Approval thus ensures that each ASHRAE standard, guideline, or portion thereof is generally acceptable to the directly and materially interested parties.
>> Return to Section 7 | Return to Top <<
7.2 GENERAL
Standards and guidelines shall be designated, developed, published, and maintained in accordance with these Procedures.
7.2.1 Public Review
7.2.1.1 Advisory Public Review (APR)
A project committee (PC) may vote by majority of the voting membership to recommend to the SPLS Liaison that a draft standard, guideline, or portion thereof, be subjected to an APR if the PC believes that the draft contains new, unusual, or potentially controversial elements that the PC believes would benefit from increased public scrutiny prior to finalizing the draft for publication public review (no continuation letter ballot, no roll call vote record, no marked up roster, or submittal form is needed). Any comments received as a result of an APR are deemed to be "supportive" and do not need to be "resolved." Apart from acknowledging receipt of each comment, communication with commenters is optional but may be undertaken to clarify a comment's intent or to invite further participation in the standard development process. The underlying concept of the APR is to gain increased public participation early in the development process and thus to deal with, and potentially resolve, controversy before publication approval is sought. APRs are not submitted through the ANSI process.
7.2.1.2 Normal Track Public Review (NTPR)
A standards action approved by the PC for publication public review that meets any of the following criteria shall be processed as a normal track:
- There are negative votes with reason within the PC
- A credible threat of legal action (in writing) against ASHRAE has been made related to the proposed draft
- The SPLS Liaison has notified the Group Manager of Codes and Standards (GMOCS) within ten calendar day, from the receipt of the package, with specific justification, that the PC has violated due process
SPLS must approve the standards, guidelines, or portion thereof, before it can be issued for public review.
7.2.1.3 Fast Track Public Review (FTPR)
A standards action approved by the PC for publication public review that meets all of the following criteria shall be processed as a fast track:
- There are no negative votes with reason within the PC
- No credible threat of legal action (in writing) against ASHRAE has been made related to the proposed draft
- The SPLS Liaison has not notified the GMOCS within ten calendar days from the receipt of the package, with specific justification, that the PC has violated due process
No additional approvals for issuing the standard, guideline, or portion thereof for public review are required.
7.2.2 Publication Approval
Approval of standards actions by Standards Committee (StdC) that have unresolved objectors or a threat of legal action shall be preceded by formally voted recommendations by the PC. These standards actions shall be reported as an information item to the Technology Council and the ASHRAE Board of Directors (BOD).
Approval of standards actions that have no unresolved objectors and no threat of legal action shall be preceded by formally voted recommendations by the PC and processed for publication by ASHRAE staff. These standards actions shall be reported as an information item to the StdC, the Technology Council, and the ASHRAE BOD.
The standard, guideline, or portion thereof shall be deemed to have been approved by StdC upon approval of its designee.
7.2.3 Quorum Requirements
To conduct standards-related business at a meeting of a PC or its subcommittees with an official roster, StdC or its subcommittees, a quorum must be present. A quorum exists if a majority of the voting membership is present.
7.2.4 Voting Requirements for Standards Actions
When a PC considers a vote to recommend publication/public review or publication with knowledge of unresolved objections of a new, revised, or reaffirmed standard, or withdrawal of a standard, the PC shall comply with Sections 7.2.4.1 through 7.2.4.6.
7.2.4.1 Voting on Standards Actions at Meetings
Standards action votes shall only occur at meetings that have been announced. A quorum must be present for a motion to be made. PC voting members who are absent shall be given the opportunity to vote via continuation letter ballot.
7.2.4.2 Numerical Requirements for Standards Action Votes
Standards action votes must be approved by the PC with affirmative recorded votes by the majority of the voting membership of the PC.
7.2.4.3 Treatment of Negative Voters on Standards Actions
Persons who cast negative votes on a standards action vote shall be given the opportunity to provide a reason for their negative votes. If a reason is provided, the negative voter will be considered an unresolved objector. Negative voters who do not provide a reason for their negative vote or negative voters who provide a reason but indicate they are resolved will not be offered the right to appeal.
7.2.4.4 Responses to Negative Votes with Reason
A written response to each negative voter shall be provided advising them of the disposition of their objection and the reasons therefore.
7.2.4.5 Consideration of Unresolved Objections
All negative voters with a reason statement, and unresolved comments and written responses to each objection, shall be transmitted to all eligible voters to offer them an opportunity to vote, change their vote, or reaffirm their vote. If a negative vote with reason is submitted as part of this reconsideration process, no additional response is required, and the results shall be final.
7.2.4.6 Approval of Standards Actions by Approval Bodies
When recommendations for standards action votes are considered by SPLS or StdC, the recommendation must be approved by a majority of those voting at a meeting or by letter ballot.
7.2.5 Voting Rules for Meetings
Actions of PCs and PC subcommittees require approval by a majority of those voting at a meeting. Standards action votes must comply with Section 7.2.4. Issuance of an official interpretation requires affirmative votes of the majority of the voting membership.
7.2.6 Voting Rules for Letter Ballots by Project Committees
The chair of the PC may authorize a letter ballot to be issued on any matter. When a letter ballot is conducted via e-mail, it is intended that members not use “Reply to All,” but reply only to the sender of the e-mail. Open letter ballots may be discussed by the PCs during announced meetings.
7.2.6.1 Numerical Requirements for Letter Ballots
Actions of the PC and subcommittees conducted by letter ballot require approval by a majority of the voting membership of the committee. Standards action votes must comply with Section 7.2.4.2. The issuance or revision of an official interpretation requires affirmative votes of the majority of the membership.
7.2.7 Negative Votes on Letter Ballots of PCs
Persons who cast negative votes on a letter ballot shall be asked if they wish to comment on reasons for their negative votes. If a vote passes with one or more negative votes with a reason, the unresolved objections and attempts at resolution shall be recirculated to the committee to provide voting members with an opportunity to vote, reaffirm their vote, or change their vote. If a reason is not provided for the negative vote, the eligible voters are informed of the negative vote by distribution of the letter ballot results.
The chair of the entity voting by letter ballot shall provide written dispositions and reasons therefore to the negative voters who provide a reason with their negative vote. After the eligible voters have had at least seven (7) calendar days to reaffirm their votes, change their votes, or to vote, the results shall be final.
>> Return to Section 7 | Return to Top <<
7.3 MAINTENANCE OF STANDARDS AND GUIDELINES
ASHRAE standards and guidelines shall be maintained under periodic or stabilized maintenance procedures except when use of continuous maintenance procedures has been voted by the StdC. (See definitions of continuous maintenance, stabilized maintenance, and periodic maintenance in Annex A.)
When a PC does exist for a standard on periodic maintenance, the PC is required to approve a motion to initiate a revision to the standard or guideline and send that recommendation to the GMOCS and the SPLS Liaison so an ANSI Project Initiation Notification System (PINS) announcement can be made. Once the PINS has been announced, the PC may begin a revision process.
When a PC does not exist, a designated subcommittee of StdC shall (a) form interpretation committees to respond to requests for interpretation, and (b) with the advice of the cognizant technical committee, task group, or technical resource group, shall provide recommendations to the StdC concerning the need for reaffirmation; stabilized maintenance; revision based on updated references or adding a second system of units to a standard, thereby making the standard useable in either SI or I-P units; withdrawal; or the need to form a new PC to revise a standard. (See TC, TG, and TRG in Annex A.)
7.3.1 Stabilized Maintenance
Standards and guidelines recommended for stabilized maintenance shall be subject to review on a nominal ten-year cycle. The purpose of this review is to determine whether the document remains relevant and technically valid, or whether it should be revised to reflect current practices or withdrawn due to obsolescence. Refer to PASA Annex A, Section A1, “Definitions,” for the formal definition of stabilized maintenance.
7.3.1.1 Criteria for Stabilized Maintenance
A standard of guideline that is maintained under the stabilized maintenance option shall satisfy all of the following eligibility criteria:
- The standard or guideline addresses mature technology or practices and, as a result, is not likely to require revision
- The standard or guideline is other than safety or health related
- The standard or guideline has been reaffirmed at least once
- At least ten years have passed since the approval or last revision of the standard or guideline
- The standard or guideline is required for use in connection with existing implementations or for reference purposes
An ASHRAE standard or guideline maintained under the stabilized maintenance option is not required to be revised or reaffirmed on a routine five-year cycle; however, it shall be subject to review of such status on a ten-year cycle. If it is determined in connection with this review that the standard or guideline shall be placed on or continue to be maintained under the stabilized maintenance option and as such does not require revision or withdrawal, then
- For ANSI/ASHRAE standards, this determination shall be communicated to ANSI and announced in both the ANSI and ASHRAE Standards Actions.
- For ASHRAE standards or guidelines, this determination shall be announced in ASHRAE Standards Actions.
The cognizant committee shall be responsible for recommending the stabilized maintenance option to SRS. That recommendation shall be announced to ANSI (ANSI/ASHRAE standards) for stabilized maintenance public review. Approval by the StdC is not required.
A standard or guideline that is published on stabilized maintenance shall include a clear statement of the intent to consider requests for change and information on the submittal of such requests.
If a written recommendation is made at any time by a directly and materially interested party that a standard or guideline maintained under the stabilized maintenance option requires revision, then that recommendation shall be considered in the same manner as a proposal for revision but within a maximum of 60 days from receipt. The recommendation should include rationale to begin a revision (if applicable) and shall not be dismissed due to the fact that it does not necessarily suggest a specific revision. The submitter of such a recommendation shall be responded to in writing by ASHRAE staff within 60 days of receipt of the recommendation and advised of the decision relative to the maintenance status of the standard. The SRS Chair may invite the cognizant TC Chair to review the recommendation and assist in preparing a response to the proposer.
The decision to maintain a standard or guideline under the stabilized maintenance option and the process by which it is maintained shall be subject to appeal. A subsequent appeal to ANSI may be made to the ANSI Executive Standards Council based on a claim of procedural noncompliance.
>> Return to Section 7 | Return to Top <<
7.4 DUE PROCESS REQUIREMENTS
The following represents the due process requirements for development of consensus.
7.4.1 Openness
7.4.1.1 Access
Meetings of the StdC, PCs, and their subcommittees are open to all members of ASHRAE and to members of the public who are directly and materially interested in ASHRAE’s standards activities. When there is a discussion of a sensitive issue or of a personal nature, the chair of any of these committees or subcommittees may declare an Executive Session, during which only members of the committee or subcommittee and such other individuals invited by the chair shall be present.
7.4.1.2 Barriers
There shall be no undue financial barriers to participation in PCs. Participation shall not be conditional upon membership in ASHRAE or in any standard cosponsoring organization or unreasonably restricted on the basis of technical qualifications or other such requirements. (See due process in Annex A.)
7.4.1.3 Notice
Timely and adequate notice of the initiation and development of a new standard or a substantively revised standard and the establishment of a new PC shall be on the ASHRAE Web site. In addition, proposals for new American National Standards and proposals to revise, reaffirm, or withdraw approval of existing American National Standards shall be transmitted to ANSI for listing in ANSI and ASHRAE Standards Action. Notices should include a clear and meaningful description of the purpose of the proposed activity.
7.4.2 Lack of Dominance
The standards development process shall not be dominated by any single interest category, individual, or organization. Dominance means a position or exercise of dominant authority, leadership, or influence by reason of superior leverage, strength, or representation to the exclusion of fair and equitable consideration of other viewpoints. Unless a claim of dominance is submitted in writing (electronic communications) by a directly and materially interested party, no test for dominance is required. (See Section 7.4.3, and balance, dominance, and interest category in Annex A.)
7.4.3 Balance and Interest Categories
Historically, the criteria for balance are that (a) no single interest category constitutes more than one-third of the membership of a PC dealing with safety-related standards, or (b) no single interest category constitutes a majority of the membership of a PC dealing with other than safety-related standards.
The interest categories appropriate to the development of consensus for a standard are a function of the nature of the standard being developed. In defining the interest categories appropriate to the standards activity, consideration shall be given at least to the following:
Where appropriate, more detailed categories or subcategories may be considered.
7.4.4 Balance and Interest Categories
ASHRAE shall, as deemed appropriate and needed, provide additional forms, commentary, examples, educational materials, and related information that will support the application and use of these procedures.
7.4.4.1 Appeals to Board of Directors
Annex B provides an appeal mechanism for the impartial handling of procedural complaints regarding any BOD action or inaction.
7.4.4.2 Complaints of Inactions by the Standards Committee, Its Subcommittees, or Project Committees
In addition to formal appeal of StdC standards actions or inactions, failure of the StdC, its subcommittee(s), or a PC to consider a written request may be addressed in writing (including electronic communication) to the GMOCS at any time. (See Annex C.)
7.4.5 Public Review Period
The public review comment period shall normally be the minimum allowed by ANSI unless more time is justified. Limited revisions, such as Independent Substantive Changes (ISCs) and addenda up to five (5) pages may have a 30-day comment period.
7.4.6 Consideration of Public Review Comments Received
All comments to public review drafts shall be submitted electronically via the online standards review database (OSR). An exception to this rule may be granted by the GMOCS if the commenter can demonstrate that he/she does not have ready access to the internet. The PC chair or his/her designee shall submit responses to commenters electronically via the OSR or, in special cases, in the medium specified by GMOCS.
Public review comments received during open public review shall be reported to all members of the PC. Prompt consideration shall be given to all public review comments, including those received through ANSI. An effort to resolve all negative public review comments shall be made, and each negative commenter shall be advised in writing (including electronic communication) of the disposition of the objections and reasons therefore. After consideration of comments or because of new information received, the PC may make changes to the draft. If the committee determines a full subsequent public review is required, responses to comments on the previous public review are not required and interested parties shall be notified of the right to comment on the new draft in ASHRAE and ANSI Standards Actions. Any substantive changes in the draft must be approved and voted on by the PC for publication public review. (See substantive change in Annex A). The PC may consider any public review comments received after the close of the public review period or shall consider them as a new proposal.
7.4.6.1 Late Comments Received Under Periodic Maintenance
Comments received after close of open public review under ASHRAE’s periodic maintenance procedures may be held for consideration at the next revision at the discretion of the PC.
7.4.6.2 Comments Received Under Continuous Maintenance
An SSPC or SGPC that is designated by the StdC as operating under continuous maintenance procedures shall take documented, consensus action on each request for change to any part of its standard or guideline.
7.4.7 Consideration of Standards Proposals
Prompt consideration shall be given by the StdC to proposals made for developing new standards or guidelines or revising, reaffirming, stabilizing, or withdrawing existing standards and guidelines.
7.4.8 Records
Records shall be maintained to provide evidence of compliance with the record retention policy in the ANSI Procedures. Records concerning new, revised, reaffirmed, or stabilized periodic maintenance standards shall be retained for one complete standards cycle, or until the standard is revised. Records concerning new, revised, stabilized, or reaffirmed continuous maintenance standards shall be retained for a minimum of five years or until the standard is completely revised or reaffirmed. Records concerning withdrawn standards shall be retained for at least five years from the date of withdrawal.
>> Return to Section 7 | Return to Top <<
7.5 CONSENSUS
Evidence of consensus associated with the approval of any standards, guidelines, or portions thereof by the PC shall be documented.
>> Return to Section 7 | Return to Top <<
7.6 CRITERIA FOR APPROVAL
This section outlines approval requirements for ASHRAE standards, guidelines, or portions thereof.
7.6.1 Approval of Standards
With respect to any proposal to approve, revise, or reaffirm an ASHRAE standard, evidence of the following shall be considered:
- The applicable procedures were followed
- The standard, or portion thereof, is within the scope of ASHRAE’s ANSI registered standards activities
- Notice of the development process for the standard was provided to ANSI in accordance with PINS or its equivalent
- Any identified conflict with another ASHRAE or American National Standard was addressed in accordance with the ANSI ER
- Other known national standards were examined with regard to harmonization and duplication of content, and if duplication exists, there is a compelling need for the standard
- ANSI’s patent policy is met, if applicable
- ANSI’s policy on commercial terms and conditions is met, if applicable
- Consensus was achieved, including evidence of the following:
- Title and designation of the proposed American National Standard
- Indication of the type of action requested (that, is approval of a new American National Standard or reaffirmation, revision, or withdrawal of an existing American National Standard)
- The applicable procedures were followed
- The standard is within the scope of the previously registered standards activity
- Declaration that conflicts with another American National Standards have been addressed per procedures
- A roster of the consensus body indicating the votes of each member, each member’s interest category, and a summary of the vote
- All appeal actions related to the standard have been completed (shall meet the criteria of Annex B, Sections B1 through B6)
- Identification of all unresolved negative views and objections, with the names of the objector(s), and a report of attempts toward resolution
- A declaration that the criteria contained in the ANSI patent policy have been met, if applicable
In addition, ASHRAE shall consider any evidence provided that the proposed standard, or portion thereof, is contrary to the public interest, contains unfair provisions, is unsuitable for national use, contradicts federal law(s), or is technically inadequate.
ASHRAE shall not approve standards that duplicate existing or proposed American National Standards unless there is a compelling need.
7.6.2 Approval of Guidelines
With respect to any proposal to approve, revise, stabilize, or reaffirm an ASHRAE guideline, evidence of the following shall be considered:
- The applicable procedures were followed
- Other known national standards were examined with regard to harmonization and duplication of content, and if duplication exists, there is a compelling need for the guideline
- Consensus was achieved, including evidence of the following:
- The applicable procedures were followed
- Declaration that conflict and duplication issues with American National Standards have been addressed per procedures
- A roster of the consensus body indicating the votes of each member, each member’s interest category, and a summary of the vote
- Identification of all unresolved negative views and objections, with the names of the objector(s), and a report of attempts toward resolution
- Any appeal meeting the criteria of Sections B1 through B6 of Annex B was completed
In addition, ASHRAE shall consider any evidence provided that the proposed guideline is contrary to the public interest, contains unfair provisions, is unsuitable for national use, contradicts federal law(s), or is technically inadequate.
>> Return to Section 7 | Return to Top <<
7.7 CRITERIA FOR WITHDRAWAL OF STANDARDS OR GUIDELINES
7.7.1 Requirements
In considering a proposal for withdrawal of an existing ASHRAE standard, guideline, or portion thereof, the StdC shall consider evidence that:
- Due process requirements were met;
- Consensus was achieved concerning the withdrawal of the existing standard, guideline, or portion thereof or consensus is lacking for its continued approval;
- The proposal for withdrawal as an ANSI/ASHRAE standard, ASHRAE guideline, or portion thereof was provided to the administrator(s) of the appropriate USA Technical Advisory Group(s); and
- Any appeal to ASHRAE was completed.
7.7.2 Withdrawal for Cause
In the case of a proposal to withdraw an existing ASHRAE standard, guideline, or portion thereof for cause, the StdC shall consider evidence that:
- A significant conflict exists with an American National Standard,
- ANSI’s patent policy was violated,
- Opportunity for consideration of revision was given but revision was not completed, or
- The ASHRAE standard, guideline, or portion thereof:
- Is contrary to the public interest,
- Contains unfair provisions,
- Is technically inadequate, or
- Is unsuitable for national use.
7.7.3 Other Bases for Withdrawal of Approval
The ASHRAE StdC or its designee also may withdraw approval of an ASHRAE standard, guideline, or portion thereof upon (a) advice of counsel, based on evidence of a legal nature, or (b) consideration of facts that have subsequently come to the attention of StdC.
>> Return to Section 7 | Return to Top <<
7.8 STANDARD PROJECT DISCONTINUANCE
7.8.1 Project Discontinuation Due to Lack of Membership
Project discontinuation due to lack of membership shall be based on the following:
- A new project shall be discontinued by the GMOCS if a PC chair and balanced membership have not been approved by SPLS within twelve months after the project is approved by the StdC.
- A revision project shall be considered for reaffirmation public review, stabilized maintenance public review, or withdrawal public review by SRS if a PC chair and balanced membership have not been approved by SPLS within twelve months after the project is approved by the StdC.
- If committee membership has previously been approved, discontinuation of a project requires approval by SPLS and the StdC.
Reasons for discontinuance include, but are not limited to, the following:
- The committee has become out of balance.
- There is no PC chair.
- There is an insufficient number of PC members on the committee for a period not less than seven months.
Waivers of the discontinuation specified above shall be approved by SPLS and StdC, shall have a deadline, and shall contain specific action to be taken by the PC. Multiple waivers shall not be granted in succession.
ASHRAE shall notify ANSI of all discontinued projects.
7.8.2 Project Discontinuation Due to Lack of Performance
If the PC has not officially met for twelve months or is not advancing the development of the standard, guideline, or portion thereof in a timely manner, then the SPLS liaison shall determine whether another chair should be sought or whether the matter should be sent back to PPIS to re-evaluate the need for the project. If the project is discontinued, ASHRAE shall notify ANSI.
>> Return to Section 7 | Return to Top <<
7.9 FINAL NOTICE
Notice of the final action on standards shall be announced in the ASHRAE Standards Actions.
>> Return to Section 7 | Return to Top <<
7.10 EMERGENCY INTERIM STANDARDS ACTION
Emergency Interim Standards Action may be taken by the Society President without completing all elements of due process on an ASHRAE standard that has been published or has received publication approval by the (BOD). An Emergency Interim Standards Action has effect for limited duration and is for the exclusive purpose of correcting errors, other than errata, when failure to take timely corrective action would:
- Substantively undermine the purpose or technical credibility of the standard taken as a whole, or
- Constitute undue risk to health or safety of the public or users of the standard.
The GMOCS shall notify ANSI if an Emergency Interim Standards Action has been taken on a published or candidate American National Standard. These procedures do not apply to guidelines.
When an Emergency Interim Standards Action is taken, the StdC shall initiate concurrent development of a revision or addendum, or initiate withdrawal procedures, to permanently correct the problem using ASHRAE’s consensus procedures. If corrective standards action is not approved by the (BOD) for publication within two years, the Emergency Interim Standards Action shall be immediately terminated. (See Annex E.)
>> Return to Section 7 | Return to Top <<
7.11 INTERPRETATION REQUESTS OF STANDARDS
Interpretation requests for a standard must be submitted to the GMOCS in writing. The Manager of Technical Services or the chair of the current or past cognizant PC or the chair’s designee may respond in writing to written requests for unofficial personal interpretations. Cognizant SSPCs, if they exist, and SPCs that have not yet been disbanded will be asked to respond to requests for official interpretations in writing. If no PC exists, StdC will form an Interpretations Committee (IC) to respond. Procedures for interpretations of published standards, guidelines, or portion thereof are provided in StdC MOP Reference Manual, Section 8. An issuance or revision of an official interpretation requires affirmative votes for the majority of the membership.
>> Return to Section 7 | Return to Top <<
7.12 INTERPRETATION REQUESTS OF ASHRAE STANDARDS DEVELOPMENT PROCEDURES
Interpretation requests for ASHRAE’s standards development procedures must be submitted to the GMOCS in writing. ASHRAE staff may respond in writing to written requests for unofficial personal interpretations. Requests for official interpretations of procedures shall be submitted to PPIS. An issuance of an official interpretation requires affirmative votes for the majority of the membership of PPIS.
>> Return to Section 7 | Return to Top <<
SECTION 8: PROCEDURES FOR SYNCHRONIZATION OF THE ASHRAE AND INTERNATIONAL STANDARDS REVIEW AND APPROVAL PROCESS
When opportunities arise, the Standards Committee (StdC) will encourage project committees (PCs) to synchronize the review and approval process for ASHRAE and international standards consistent with ANSI procedures. If it is recommended that ASHRAE should use the expedited procedures for the identical adoption of an International Standards Organization (ISO) or International Electrotechnical Commission (IEC) standard, the procedures in ANSI Procedures for the National Adoption of ISO and IEC Standards as American National Standards shall apply.
>> Return to Main Index | Return to Top <<
SECTION 9: PATENTS
ASHRAE agrees to comply with the Patent Policy as stated in ANSI Essential Requirements.
>> Return to Main Index | Return to Top <<
SECTION 10: COMMERCIAL TERMS AND CONDITIONS
ASHRAE agrees to comply with the Commercial Terms and Conditions policy as stated in ANSI Essential Requirements.
>> Return to Main Index | Return to Top <<
SECTION 11: ANTITRUST POLICY
ASHRAE agrees to comply with the Antitrust Policy as stated in ANSI Essential Requirements.
>> Return to Main Index | Return to Top <<
SECTION 12: PINS
At the initiation of a project to develop or revise an ASHRAE American National Standard, ASHRAE shall use the ANSI Project Initiation Notification System (PINS) form. Comments will be addressed in accordance with clause 2.5.1 of the current version of the ANSI Essential Requirements.
>> Return to Main Index | Return to Top <<
ANNEXES
>> Return to Top <<
ANNEX A
This normative annex is part of the Procedures (PASA).
DEFINITIONS | ABBREVIATIONS AND ACRONYMS
A1. DEFINITIONS
addenda: revisions to a standard or guideline in the form of a supplement.
alternate organizational representative (AOR): an individual empowered by an organizational member of a project committee to act on their behalf in the activities of the project committee when the representative of the organizational member is absent.
annex: material or attachment of a nonmandatory nature that is supplemental to a standard or guideline and that is not also classified as an appendix. Inclusion of annexes must be preapproved by ASHRAE staff. Changes to annexes are not considered substantive. Unless excerpted from another publication, annexes can be changed or deleted without requiring public review. See informative appendix and normative appendix.
appendix: see informative appendix and normative appendix.
balance: a condition existing when (a) no single interest category constitutes more than one-third of the membership of a project committee dealing with safety, or (b) no single interest category constitutes a majority of the membership of a project committee. (Also see Section 7.4.3.)
clause: the basic component in the subdivision of the text of a standard. See subclause and paragraph.
code intended standard: a standard intended to be adopted as a code using code language.
code language document: a document that presents a set of requirements related to the design, application, or use of HVAC&R and related technologies where all or portions of the document may be enacted as mandatory enforceable requirements by a political jurisdiction. Portions intended to be enforced (normative) are written in mandatory, enforceable language. Portions not intended to be enforced are identified as informative and are to be located in informative notes, in informative annexes (appendices), or in other advisory documents. See annex, informative annex, informative notes, and normative annex.
cognizant TC/TG/TRG: the ASHRAE Technical Committee, Task Group, or Technical Resource Group within whose scope a particular standard’s technical content most logically falls. The cognizant TC/TG/TRG provides technical advice to the Standards Committee when a standard project committee does not exist.
conflict (between standards): refers to a situation where, viewed from the perspective of an implementer, the terms of one standard are inconsistent with the terms of another standard such that implementation of one standard necessarily would preclude proper implementation of the other standard in accordance with its terms.
conflict of interest: any incompatibility between an individual’s private interests and his or her fiduciary duties as an ASHRAE volunteer.
consensus: substantial agreement, in the judgment of a duly appointed authority, reached by directly and materially interested categories. Substantial agreement means much more than a simple majority, but not necessarily unanimity. Consensus requires that all views and objections be considered and that an effort be made toward their resolution. It is not required that each separate interest subcategory reach consensus on the standard or guideline. For ASHRAE standards and guidelines and any jointly sponsored standards and guidelines that use ASHRAE Procedures, the project committee is the consensus body. “Duly appointed authority” means the Board of Directors of ASHRAE and, in the case of jointly sponsored standards, the Boards of Directors of ASHRAE and the joint sponsor(s). For American National Standards, “duly appointed authority” means the ANSI Board of Standards Review.
continuous maintenance: maintenance of a standard by an SSPC or SGPC for which procedures have been established to consider and process proposed changes as they are received.
dominance: a position or exercise of dominant authority, leadership, or influence by reason of superior leverage, strength, or representation to the exclusion of fair and equitable consideration of other viewpoints.
draft types:
advisory public review draft: a draft submitted for public review that contains unusual, potentially controversial, or new elements that the project committee believes would benefit from increased public scrutiny prior to finalizing the draft for publication public review.
publication public review draft: a draft approved for public review that will proceed directly to publication if, as a consequence of the review, no substantive changes are made to the draft.
working draft: an unapproved draft produced for consideration by the project committee or a subcommittee.
due process: a course of proceedings carried out in accordance with established rules and principles. Due process allows for equity and fair play for all participants. It means that any person with a direct and material interest in a standard or guideline has a right to participate by (a) expressing a position and its basis, (b) having that position considered, and (c) appealing if adversely affected.
Emergency Interim Standards Action: action taken by the Society President, without completing all elements of due process, on an ASHRAE standard that has been published or has received publication approval by the Board of Directors. An Emergency Interim Standards Action has effect for limited duration and is for the exclusive purpose of correcting errors, other than errata, when failure to take timely corrective action would:
- Substantively undermine the purpose or technical credibility of the standard taken as a whole, or
- Constitute undue risk to health or safety of the public or users of the standard.
errata: a list of errors discovered after a document is published. Examples include, but are not limited to, the following:
- Typographical errors
- Misprints
- Misspellings
- Grammatical errors
- Omission of material approved by the StdC
- Erroneous inclusion of material
fast track: an approval procedure for a standard, guideline, or portion thereof, that meets the following criteria:
- There are no negative votes with reason within the PC.
- No credible threat of legal action (in writing) against ASHRAE has been made related to the proposed draft.
- The SPLS Liaison has not notified the Group Manager of Codes and Standards within ten calendar days from the receipt of the package, with specific justification, that the project committee has violated due process.
(See normal track)
five-year review: a review of need for standards action, scheduled so that processing and final approval of the resulting recommended action may reasonably be expected within five years from the date of Board approval of publication of ASHRAE standards and guidelines, or within five years of ANSI approval as an American National Standard.
foreword: introductory remarks, not part of the standard or guideline.
guideline: a guideline is a document written in informative language that provides state-of-the-art design or best practice guidance. Guidelines provide information on system selection, design approaches, practices, and goals as well as setting optimum achievable performance levels. Guidelines may address issues of concern such as startup and commissioning, operation and maintenance, and assurance that the goals of the associated standard (if any) are achieved. (See ROB 1.201.004.)
independent substantive change (ISC): a substantive change that is independent of any other substantive change and that does not significantly affect any other requirement in the standard or guideline. See substantive change.
informative appendix: additional information of a nonmandatory nature that is specific to a standard or guideline. Changes to informative appendices are not considered substantive. Informative appendices can be changed or deleted without requiring public review. See normative appendix.
informative language: language used in those elements of a standard, guideline, or portion thereof for which compliance is not required, often characterized by the use of “should” or “may.”
informative notes: explanatory information, appearing in a standard, that does not contain requirements or any information considered indispensable for the use of the standard. Informative notes are to begin with the word “(Informative Note[s])” and be placed after the section of the standard to which the note applies. If the informative note is more than two sentences, the information shall be placed in an informative annex and referred to by the informative note. Where there is more than one informative note, the notes must be numbered sequentially.
interest: the perspective of a member of a project committee, as judged by his or her present and past sources of income, fees, or reimbursements of related expenses, in the context of the purpose and scope of the project committee. The perspective may also be judged by the recorded views of the individual or of any organization he/she is employed by or of which he/she is a member.
interest category: a category identified to represent a specific interest.
interest categories: a classification of project committee member interests. For some projects, it may be appropriate to designate subcategories of one or more interest category. Default interest categories are:
Producer: a member who represents the interest of those that produce materials, products, systems, or services covered in the project scope.
User: a member who represents the interest of those that purchase or use materials, products, systems, or services covered in the project scope.
General: a member who cannot be categorized in any other approved interest category covered in the project scope.
Additional examples of interest categories and subcategories that have been used can be obtained from the Group Manager of Codes and Standards.
International Organization for Standardization (ISO): an international non-treaty standards organization based in Geneva, Switzerland. Its members, national standards bodies, promulgate standards covering all fields except electrical. The American National Standards Institute is the U.S. member body.
international organizational liaison (IOL): a nonvoting representative of an international trade or professional organization, international standards committee, or other group with an interest in the work of the project committee.
interpretation: the written explanation of the meaning of specific provisions of a standard or guideline, as determined by the project committee or the interpretations committee in response to an inquiry.
interpretations committee (IC): a committee of technically qualified individuals whose function is to interpret an ASHRAE standard or guideline.
mandatory language: language that prescribes the requirements of a standard in a manner that is clear and unambiguous. It provides a basis for determining, without a doubt, whether or not compliance with the standard has been achieved. It is often characterized by the use of “shall” or “must.”
normal track: an approval procedure applied to a standard, guideline, or portion thereof that meets one or more of the following criteria:
- Receives one or more negative votes with reason upon approval for publication, or
- Where ASHRAE receives a written legal threat.
(See fast track)
normative appendix: additional information of a mandatory nature that is specific to a standard or guideline and which, for reasons of convenience, is placed after the main body of the document. See informative appendix.
nonvoting member (NVM): an NVM is an additional type of membership for project committees not formally organized into subcommittees. NVMs are not eligible to vote on project committee motions. NVMs are not included in interest balance or quorum requirements.
organization: a group of people representing a particular interest such as a trade association, public interest group, or government agency.
organizational member (OM): an OM is an organization with a voting representative on the project committee that represents the interests of that particular organization rather than serving as an individual.
periodic maintenance: review and action on a nominal five-year cycle to revise a standard or to reaffirm or withdraw a standard or guideline.
project committee (PC):a standard project committee, standing standard project committee, guideline project committee, or standing guideline project committee that serves as the consensus body as defined by ANSI for a standard, guideline, or portion thereof.
project committee voting member (PCVM): PCVMs are eligible to vote on project committee motions. PCVMs are also eligible to vote on subcommittee motions to which the PCVM is appointed.
project subcommittee voting member (PSVM): PSVMs are eligible to vote on subcommittee motions to which the PSVM is appointed. PSVMs are not eligible to vote on project committee motions. PSVMs are not included in interest balance and quorum requirements for the project committee.
public review comment: views and/or objections to standards, guidelines, or portions thereof submitted in accordance with procedures specified in the public review draft during a public review.
rating: the assigned values of those performance characteristics, under stated conditions, by which a piece of equipment may be chosen to fit its application. These values apply to all equipment of like nominal size and type (identification) produced by the same manufacturer.
standard rating: a rating based on tests performed at standard rating conditions.
application rating: a rating based on tests performed at application rating conditions (other than standard rating conditions).
rating conditions: a set of operating conditions under which a level of performance is determined or measured.
standard rating conditions: rating conditions used as the basis of comparison of performance characteristics.
shall: a verb used to indicate a requirement.
should: a verb used to indicate a recommendation.
SPLS liaison: a member of the Standards Project Liaison Subcommittee (SPLS) assigned to act as a Standards Committee advisor to a project committee.
stabilized maintenance: the process by which a standard or guideline is subject to review on a nominal ten-year cycle, with the objective of determining whether it should be revised to reflect current practices or withdrawn due to obsolescence or lack of continued relevance.
standard: a document established by authority or rule that defines properties, processes, dimensions, materials, relationships, procedures, concepts, nomenclature, or test methods for rating purposes. Adherence to due process in its development and achievement of consensus are conditions of approval.
standards action vote: an action recommending or approving publication or publication public review of a new, revised, reaffirmed, or stabilized maintenance standard, guideline, or portion thereof, or withdrawal of a published standard, guideline, or portion thereof.
Standards Action: a periodical published by ANSI to inform interested persons about American National Standards (ANSs), including proposals to initiate projects to develop or revise ANSs, announce intent to reaffirm, stabilize, or withdraw existing ANSs, communicate status of international standards, announce public review of proposed or revised procedures of ANSI accredited standards developers, etc.
standard project committee (SPC): a committee of technically qualified individuals with a balanced representation of interests whose function is to formulate, review, reaffirm, or revise an ASHRAE standard. The SPC is the consensus body and is responsible for the technical content of the standard. It is discharged upon publication of the standard.
standing standard project committee (SSPC): a committee similar in membership and function to a standard project committee except that the committee has a continuing assignment of duties and responsibilities with respect to a standard. It is expected to provide addenda as needed, generate revision on a regular basis, and render interpretations.
subcommittee: a group of individuals appointed by the project committee chair from among the project committee membership who vote on subcommittee activities and whose responsibility it is to develop drafts of one or more assigned sections of a standard, annexes, or addenda; develop draft responses to requests for interpretation; or develop proposed responses to comments resulting from public review; all submitted as recommendations for action by the parent project committee. Subcommittees may also be formed to draft Standards Committee-approved standards or guidelines related to the subject matter of the parent project committee.
substantive change: a change that involves an important (has value, weight, or consequence), fundamental (is the foundation, without which it would collapse), or essential (belongs to the very nature of a thing) part or changes the meaning of the material or that directly and materially affects the use of the standard. Changes that may be found substantive when examined in context.
- “Shall” to “should” or “should” to “shall”
- Addition, deletion, or revision of mandatory requirements, regardless of the number of changes
- Addition of mandatory compliance with referenced standards
Changes or deletions made to portions of a draft not intended as part of the approved standard (e.g., a foreword, informative annex, or note), are not considered substantive.
See independent substantive change.
system of units: inch-pound units (I-P) or International System of Units (SI).
technical resource group (TRG): a committee of technical experts appointed by Technical Activities Committee to prepare or review technical material for standards, ASHRAE Handbook, journal articles, and technical papers.
unit conversions—definitions:
alternate system of units: the system of units listed second (expressed in parentheses when dual systems, I-P and SI, are used, expressed in either consistent rational or equivalent values).
equivalent: exact arithmetic conversions, also called “soft conversion.”
primary system of units: the system of units listed first (expressed in rational values).
rational: based on, or derived from, logical or coherent numbers. Rational values are usually, but not necessarily, rounded numbers. Rational values are not necessarily bound by mathematical equivalency of the primary and secondary units systems. The conversion process is sometimes called “hard conversion.”
unresolved objectors: all unresolved commenters and negative project committee voters who provided a reason for their negative vote on a standards action vote since the last full public review.
unresolved public review commenter: an individual who, during the comment period, submitted public review comments to a proposed or revised draft standard, guideline or portion thereof, was not satisfied with the committee response to those comments, and within the time period and procedure specified in the response, requested to remain “unresolved.”
>> Return to Annex A | Return to Top <<
A2. ABBREVIATIONS AND ACRONYMS
| ANS |
American National Standard |
| ANSI |
American National Standards Institute |
| ASHRAE |
American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. |
| BOD |
Board of Directors |
| CIS |
Code Interaction Subcommittee |
| IC |
Interpretations Committee |
| IOL |
International Organizational Liaison |
| I-P |
Inch-pound units: units using inches, pounds, and other designations, as opposed to SI units in the metric system. Examples are foot, Btu, horsepower, and gallon. |
| ISC |
Independent substantive change |
| ISO |
International Organization for Standardization |
| GMOCS |
Group Manager of Codes and Standards |
| PC |
Project Committee |
| PCVM |
Project Committee Voting Member |
| PPIS |
Planning, Policy, and Interpretation Subcommittee |
| PSVM |
Project Subcommittee Voting Member |
| SI |
Le Système International d’Unités; the international agreement on the metric system of units. A practical system of units divided into three classes: base units, derived units, and supplementary units. The base units are composed of the units of the following seven quantities: length (meter), mass (kilogram), time (second), electric current (ampere), thermodynamic temperature (Kelvin), amount of substance (mole), and luminous intensity (candela).
The second class of SI units contains derived units, which can be formed by combining base units according to the algebraic relations linking the corresponding quantities. The names and symbols of some units formed in terms of base units can be replaced by special names and symbols that can themselves be used to form expressions and symbols of other derived units.
A third class of SI units, called supplementary units, contains the SI units of plane and solid angle. (Ref. Le Système International d’Unités) |
| SPC |
Standard Project Committee. The use of this acronym means that a procedure applies only to an SPC and not to an SSPC. |
| SSPC |
Standing Standard Project Committee. The use of this acronym means that a procedure applies only to an SSPC and not to an SPC. |
| SPLS |
Standards Project Liaison Subcommittee |
| SRS |
Standards Reaffirmation Subcommittee |
| StdC |
Standards Committee |
| TAC |
Technical Activities Committee |
| TC |
Technical Committee appointed by the TAC |
| TRG |
Technical Resource Group appointed by TAC |
| TG |
Task Group appointed by the Technical Activities Committee |
| TPS |
Title, Purpose, and Scope |
>> Return to Annex A | Return to Top <<
ANNEX B
This normative annex is part of the Procedures (PASA).
SCOPE | APPEALABLE MATTERS | WHO MAY APPEAL | SCOPE OF APPEAL AND BURDEN OF PROOF | CONTENT OF APPEALS | NOTIFICATION PROCEDURES | APPEALS BOARD | CONSIDERATION OF APPEALS | HEARING OF APPEALS | APPEALS PANEL DECISION
B1. SCOPE
This procedure applies to appeals of ASHRAE standards or guidelines and of jointly sponsored standards for which ASHRAE is the lead sponsor.
>> Return to Annex B | Return to Top <<
B2. APPEALABLE MATTERS
An action or inaction of the Standards Committee (StdC) to adopt a new ASHRAE standard or guideline; an addendum to an existing standard or guideline; or to revise, reaffirm, or withdraw an existing ASHRAE standard or guideline is subject to appeal.
>> Return to Annex B | Return to Top <<
B3. WHO MAY APPEAL
Any person directly and materially interested who has been or will be adversely affected by the publication of a new, revision, reaffirmation, or withdrawal of an ASHRAE standard, guideline, or portion thereof, or lack of such action, may appeal the StdC action or inaction. The appellant must be an unresolved public review commenter; associated with a new, revision, reaffirmation, or withdrawal of the ASHRAE standard or guideline being appealed; or a project committee (PC) member who cast a negative vote with reason(s) in relation to his/her vote on the consensus body associated with the creation, revision, reaffirmation, or withdrawal of the ASHRAE standard or guideline being appealed.
>> Return to Annex B | Return to Top <<
B4. SCOPE OF APPEAL AND BURDEN OF PROOF
An appeal of a StdC standards action or inaction shall be solely based upon procedural grounds. When appeals are filed, the appellant shall demonstrate that ASHRAE standards development procedures were not followed. Appeals arguments that are based on actions that took place in previous revision cycles will not be considered.
>> Return to Annex B | Return to Top <<
B5. CONTENT OF APPEALS
Each appeal shall:
- Identify the appellant and include the appellant’s contact information;
- Substantiate that the appellant is a directly and materially interested party who has been or will be adversely affected by action(s) being appealed;
- Identify with precision the standard, guideline, or portions thereof and the procedure(s), alleged improper action or inaction appealed;
- State concisely the basis for the appeal, the remedial action requested, and the nature of any injury to appellant which might accrue from the matter appealed;
- Include any summary supporting data or documentation relied upon as the basis for the appeal;
- Consolidate information to be as concise as possible;
- Only include information that was made available to the PC prior to the final vote of the PC;
- Include the filing fee; and
- Only include information that was previously submitted during the development of the standard or addendum.
B5.1 Filing Fee
Each appeal shall be accompanied by a filing fee in the amount established by the Technology Council. The filing fee is predetermined and shall be listed on the Appeals Submittal Form. The fee may be waived or reduced by the Appeals Panel Chair upon sufficient evidence of hardship submitted by the appellant. If the filing fee is not submitted by the appeal filing deadline date by the appellant, then the appeal shall be dismissed unless an exception has been granted prior to the close of business on the filing deadline date.
B5.2 Copies
It shall be the responsibility of the appellant to submit an electronic copy and, if requested by the Group Manager of Codes and Standards (GMOCS), up to twenty-five (25) paper copies of each appeal filed at the time of the original electronic submittal.
>> Return to Annex B | Return to Top <<
B6. NOTIFICATION PROCEDURES
Within fifteen (15) business days following StdC action on a standard that results in approval of a new, revision, reaffirmation, or withdrawal of a standard or addenda to a standard, the GMOCS shall notify in writing (including electronic communication) all unresolved public review commenters and/or a PC member who cast negative votes with reason(s) in relation to his/her vote on the consensus body of the StdC action and inform them of their right to appeal that action.
B6.1
An appeal must be received by the ASHRAE GMOCS within fifteen (15) business days of the date on the notification letter regarding the StdC action. The Chair of the Appeals Board may grant an extension, if requested prior to the close of the initial 15 business day period and if sufficient justification is provided.
B6.2
Normally, any standards action by the StdC will be suspended during pendency of appropriately filed appeal(s). The President of the Society may, however, maintain the StdC action until and if the Appeals Panel decides to dismiss the appeal, without a hearing, up to a maximum of 90 calendar days. If the Panel decides to dismiss the appeal without a hearing, the President may maintain the action until the next meeting of the StdC. The appealed StdC action shall be immediately suspended if the Appeals Panel does not dismiss the appeal.
B6.3
The GMOCS shall acknowledge receipt of the appeal, copy acknowledgement to the Chief Staff Officer, notify the President, and send copies of the appeal to the Appeals Board Chair and to the chairs of Technology Council, StdC, and the PC that developed or revised the standard or guideline. Upon receipt of the appeal, an Appeals Panel will be established in accordance with Section B8 for the purpose of determining if the appeal will be heard or if the appeal will be dismissed without a hearing or upheld without a hearing.
>> Return to Annex B | Return to Top <<
B7. APPEALS BOARD
B7.1
An Appeals Board and a chair of the Board shall be appointed by the ASHRAE President, with the approval of the Board of Directors (BOD). The Appeals Board shall have fifteen (15) members. The Appeals Board shall consist of past members of the BOD, past members of the StdC or Technology Council, and/or persons who are knowledgeable about the ANSI Standards development process.
B7.2 Terms of Membership
Terms shall be staggered so that approximately one-third of the membership of the Appeals Board is appointed each year. Members shall be appointed for a term of three years commencing on July 1 and shall be eligible for reappointment for one additional three-year term, for a total of two consecutive terms. A member of the Appeals Board may serve beyond the normal two-term limitation if the member is serving as chair, provided the term of chair is contiguous with the six-year tenure as a member. The total maximum length of service under such circumstances would be nine years.
B7.3 Vacancies
A vacancy in the membership of the Appeals Board shall be filled for the remainder of the term by an individual appointed by the ASHRAE President.
B7.4 Conflect of Interest
A member of the ASHRAE Appeals Board shall act at all times in a manner that promotes confidence in the integrity and impartiality of ASHRAE’s processes and procedures and should avoid a conflict of interest or the appearance of a conflict of interest in connection with all ASHRAE Appeals activities. Should the Appeals Board Chair have a conflict of interest with any appeal he/she shall select another member of the Appeals Board to serve is his/her place with respect to consideration of that appeal.
A complete list of ASHRAE Appeals Board members potentially serving on the Panel shall be sent to both the appellant(s) and respondent(s) to identify any possible conflicts of interest. If a materially affected party (either the appellant or the respondent) asserts that it believes a member of the ASHRAE Appeals Board has a conflict of interest, that materially affected party is required to state the reason(s) for its belief. That information shall then be forwarded to the member of the ASHRAE Appeals Board identified as having a possible conflict for that person’s response. If that member disagrees with the assertion, then the Chair of the ASHRAE Appeals Board shall make a final determination as to whether a conflict of interest exists.
Members of the ASHRAE Appeals Board who are disqualified from a particular discussion shall not participate in the arguments, deliberations, or decisions.
B7.5
When appeals of jointly sponsored standards are being considered by ASHRAE as lead sponsor or by ANSI, the joint sponsor shall assist in preparing or responding to appeals in its field of expertise.
>> Return to Annex B | Return to Top <<
B8. CONSIDERATION OF APPEALS
B8.1 Panel Appointment
When an appeal is received by ASHRAE Headquarters in accordance with Section B6.3, six members of the Appeals Board shall be randomly selected from a pool of all Appeals Board members who do not have a conflict to hear the appeal. At least four of those selected shall be appointed as the Appeals Panel and the other two shall be appointed as alternates. The Appeals Panel alternates will participate in the hearing activities in the event that one of the four other members is unable to serve. The Appeals Board Chair will chair the Appeals Panel.
B8.2 Ineligible Panel Members
Panel Consideration of Adjudicating the Appeal Without a Hearing
Any member of the Appeals Board who served as a PCVM or PSVM on the PC that is the subject of the appeal during the three years prior to the standards action under appeal shall be ineligible to serve on the Panel. Any member of the Appeals Board who voted on the draft that is the subject of the appeal as a member of the StdC shall be ineligible to serve on the Panel.
B8.3 Panel Consideration of Adjudicating the Appeal Without a Hearing
The Appeals Panel shall decide if the appeal shall be dismissed without a hearing. In order to assess whether or not the appeal should be dismissed, the Appeals Panel Chair may provide a list of specific questions to the cognizant PC Chair and may also include any additional information to rebut the appeal. The responses shall be shared with the appellant(s) prior to the issuance of a decision by the Appeals Panel. A written response from the appellant(s) is not permitted. The Appeals Panel Chair or the Chair’s designee shall notify the ASHRAE President, the appellant, and the chair of the cognizant PC in writing of the decision. Noncompliance with Section B5 or lack of grounds for an appeal may be reasons for dismissal.
B8.4 Nondismissal of Appeal
If the appeal is not dismissed, the StdC action that has been appealed shall be immediately suspended, if not already suspended according to the first sentence of Section B6.2, and each claim in the appeal shall be considered separately and basic grounds given for each decision.
B8.5 Rebuttal
If the Panel determines that the action is not to be dismissed, the Panel will consider the responses and any additional information previously submitted from the cognizant PC chair as a rebuttal of the written statement of appeal. The GMOCS shall distribute it to the Appeals Panel and to the appellant. If during the adjudication period, the Appeals Panel does not request a list of specific questions from the cognizant PC chair, a rebuttal from the respondent(s) shall be due within 15 business days of the date on the letter of notification. The Chair of the Appeals Panel may grant an extension if requested prior to the close of the initial 15 business day period and if sufficient justification is provided. The rebuttal statement shall be sent to the GMOCS, who shall distribute it to the appellant and the Appeals Panel. The Appeals Panel has the authority to announce a hearing schedule at the time the rebuttal is requested or wait until after the rebuttal is received.
>> Return to Annex B | Return to Top <<
B9. HEARING OF APPEALS
B9.1 Notice
If a hearing is to be held, the Appeals Panel chair shall arrange for consideration of the appeal either in person or in documented electronic meetings. Both the appellant and the respondents (the Chair of the Standards Committee or his/her designee, or the Chair of the PC or the Chair’s designee, as appropriate) shall be given notice at least 15 business days prior to the hearing date, location, and time for an in-person hearing or of the hearing date for a hearing conducted by electronic meeting. The hearing may be heard before 15 business days if the appellant and the respondents agree in writing (including electronic communication).
B9.2 The Hearing
Prior to the start of the hearing, the appellant and respondent(s) shall provide the GMOCS with 15 copies of an outline of their oral presentation or an electronic copy of what will be displayed for a presentation. No new issues outside of those issues raised in the submitted appeal and rebuttal may be presented at the hearing. Only documentation that the appellant/respondent previously provided will be considered. The appellant is permitted to have up to three people speak on their behalf, and the respondent is permitted to have up to three people speak on their behalf. However, each party is only allowed a designated amount of time and that time will be shared by any and all people speaking for that party. No additional time will be granted for guests, speakers, experts, etc.
B9.3 Guests
The hearing shall be open to observation by representatives of directly and materially interested persons, although the number of observers may be limited at the discretion of the Appeals Panel Chair. Anyone planning to attend the hearing shall notify the GMOCS no less than 15 business days prior to the hearing date. Guests who are not designated to speak on behalf of the appellant or respondent are not allowed to speak during the hearing or during the question period.
B9.4 Questions
After the appellant and respondent have given their presentations, any member of the Appeals Panel may ask questions of either the appellant or respondent to clarify the information in the record. The appellant and respondent are to respond to the Panel member who asked the question. There is no time limit for this question and answer session unless specified by the Appeals Panel Chair.
B9.5 Executive Session
Following the completion of the question and answer session, the Chair of the Appeals Panel shall close the hearing and shall allow the Panel to deliberate the appeal in an Executive Session.
>> Return to Annex B | Return to Top <<
B10. APPEALS PANEL DECISION
The Appeals Panel shall decide within 15 business days of the hearing or after the receipt of the rebuttal, by majority vote, that the appeal, or any parts of the appeal, be upheld or denied. The Appeals Panel Chair shall, within 14 business days following the Appeals Panel’s decision, notify the appellant(s), Chief Staff Officer, Managing Director of Technology, Group Manager of Codes and Standards, President, Chair of Technology Council, Chair of the Standards Committee, and Chair of the PC of the decision. The decision of the Appeals Panel to uphold, deny, or dismiss an appeal shall be final. If the appeal is dismissed or denied by the Appeals Panel, the action of the StdC that was appealed shall become effective immediately.
>> Return to Annex B | Return to Top <<
ANNEX C: COMPLAINTS OF ACTIONS OR INACTIONS BY THE STANDARDS COMMITTEE, ITS SUBCOMMITTEES, OR PROJECT COMMITTEES
This normative annex is part of the Procedures (PASA).
COMPLAINTS OF ACTIONS OR INACTIONS BY THE STANDARDS COMMITTEE, ITS SUBCOMMITTEES, OR PROJECT COMMITTEES | COMPLAINTS AGAINST THE STANDARDS COMMITTEE | FEES
In addition to formal appeal of Standards Committee (StdC) standards actions or inactions (PASA Annex B), failure of the StdC, its subcommittee(s), or a project committee (PC) to consider a written complaint may be addressed by writing to the Group Manager of Codes and Standards (GMOCS) at any time. The complaint must identify the section of procedures that was violated and provide sufficient detail to support the complaint. Any committee tasked with reviewing a complaint may dismiss the claim if insufficient detail is provided.
C1. COMPLAINTS AGAINST STANDARDS COMMITTEE SUBCOMMITTEES OR PROJECT COMMITTEES
The following steps shall occur for complaints against StdC Subcommittees or PCs:
- A written complaint shall be sent to the GMOCS, and the GMOCS shall forward it to the chair of the committee in question. The GMOCS shall acknowledge receipt of the complaint. The chair of the committee in question shall provide a written response addressing the complaint to the GMOCS within 15 working days of receipt of the complaint. A waiver to the response period may be requested by the chair or ASHRAE staff to the Chair of StdC for approval. The GMOCS shall forward the written response to the complainant with a copy to the Chair of Standards Committee.
- The complainant shall notify the GMOCS in writing within 15 working days from the receipt of the response whether or not the response resolves the complaint. If no response is received, then the Chair of StdC, the complainant, and the chair of the committee will be notified that the complaint is resolved.
- If the response does not resolve the complaint, the complaint shall be forwarded to StdC. StdC shall place it on its next agenda for consideration, but a meeting shall be called no later than 15 working days after receipt of the complaint.
- The StdC Chair shall provide a written response, to the GMOCS. The GMOCS shall forward the written response to the complainant with a copy to the Chair and Vice Chair of Technology Council, the Chair of the Subject Committee, the SPLS Liaison, and the Staff Liaison within 15 working days of receipt of the complaint. A waiver to the response period may be requested by the Chair or ASHRAE staff to the Chair of Tech Council for approval. The results will be made known to the complainant and the StdC Chair.
- The complainant shall notify the StdC Chair and GMOCS in writing within 15 working days from the receipt of the response whether or not the response resolves the complaint. If no response is received, then the StdC Chair, the complainant, and the Subject Committee Chair will be notified that the complaint is resolved.
- If the complainant is unresolved, the procedures in Section C2, d, e, and f shall be followed.
>> Return to Annex C | Return to Top <<
C2. COMPLAINTS AGAINST THE STANDARDS COMMITTEE
The following steps shall occur for complaints against StdC.
- A written complaint shall be sent to the GMOCS, and the GMOCS shall forward it to the Chair of StdC. The GMOCS shall acknowledge receipt of the complaint.
- The StdC Chair shall provide a written response addressing the complainant to the GMOCS within 15 working days of receipt of the complaint. Upon receipt of the response, the GMOCS shall send it to the complainant. A waiver to the response period may be requested by the Chair or ASHRAE staff to the Chair of Tech Council for approval.
- The complainant shall notify the GMOCS in writing within 15 working days from the receipt of the response whether or not the response resolves the complaint. If no response is received, then the Tech Council Chair, the complainant, and the StdC Chair will be notified that the complaint is resolved.
- If the response does not resolve the complaint, the complaint shall be forwarded to Technology Council. Technology Council shall have the authority to decline to hear the complaint. If Technology Council hears the complaint, it is expected to approve a response to the complaint within 15 working days of receipt of the complaint. If the Technology Council needs more time to respond, the Chair of Technology Council shall notify the complainant and the StdC Chair and include a timeline of when actions will occur.
- The Technology Council Chair shall provide a written response to the GMOCS. The GMOCS shall forward the written response to the complainant with a copy to the Managing Director of Technology, Vice Chair of Technology Council, the StdC Chair, the Chair of the Subject Committee, the SPLS Liaison, and the Staff Liaison.
- Technology Council has final authority for complaints against StdC.
>> Return to Annex C | Return to Top <<
C3. FEES
Each complaint filed per Section C1 or Section C2 shall be accompanied by a filing fee set by the StdC, found in Section 1.7 of the Standards Committee Manual of Procedures. The fee may be waived or reduced by the Chair of the Technology Council upon sufficient evidence of hardship submitted by the submitter of the complaint.
>> Return to Annex C | Return to Top <<
ANNEX D: UNITS POLICY
This normative annex is part of the Procedures (PASA).
The units use or application policy shall include, as a minimum, time-dated directions on the use of SI and I-P in all ASHRAE publications.
TC 1.6 shall serve as the authority on SI and I-P usage and application.
Research projects; codes, standards, guidelines, and addenda thereto; special publications; Insights articles; Journal articles; and Handbooks shall be prepared using the International System of Units (SI) and/or inch pound units (I-P) in formats approved by the Publishing and Education Council.
The Publishing and Education Council shall review annually the approved formats to be used in AHSRAE publications, considering suggestions from members and committees, and shall establish any changes in the approved formats.
The Publishing and Education Council shall consider this Units Policy annually and shall recommend to the Board of Directors the formats to use in ASHRAE publications.
- The format for ASHRAE publications shall be dual units, except in cases determined by the Publishing and Education Council, where two separate versions are to be published, where one is rational SI and the other is rational I-P. For selected ASHRAE standards and guidelines, the Standards Committee may approve use of SI units only.
- In dual unit publications, the units used in calculating the work being reported shall be listed first. The alternate system of units should follow in parentheses. Authors shall round off equivalents in the alternate system of units so that they imply the same accuracy as is implied with primary units. Exceptions require the approval of the Director of Publishing and Education. Handbook volumes shall be published in separate SI and I-P editions.
>> Return to Main Index | Return to Top <<
ANNEX E: PROCEDURES—EMERGENCY INTERIM STANDARDS ACTION
This normative annex is part of the Procedures (PASA).
JUSTIFICATION | PC OR PPIS RECOMMENDATION | GMOCS RECOMMENDATION | REVIEW AND COMMENT | PRESIDENT WILL ACT | NOTIFICATIONS
Scope: Emergency interim actions shall apply to standards and guidelines.
E1. JUSTIFICATION
The burden of demonstrating need for an Emergency Interim Standards Action rests with the proposer. Interested persons may submit proposals for Emergency Interim Standards Actions to the Group Manager of Codes and Standards (GMOCS). Proposals must include the following information:
- Identify the proposer, affiliation, and contact information;
- Identify the standard or guideline and clause containing the error;
- Describe the error claimed and provide supporting information or data, if any;
- Recommend a change in text, equation, etc. that would eliminate the error or reduce it to acceptable limits and provide supporting information or data, if any;
- Show compliance with the criteria of Section 7.10(a) or 7.10(b); and
- Identify the type of harm that has been or may be caused by the error.
>> Return to Annex E | Return to Top <<
E2. PC OR PPIS RECOMMENDATION
Proposals that meet the criteria of Section 7.10 shall be forwarded to the body designated in Section E5.
When a project committee (PC) having jurisdiction exists, the PC shall submit a recommendation to the GMOCS on disposition of a proposed Emergency Interim Standards Action at a PC meeting or by letter ballot within 14 days. When a PC does not exist, PPIS shall act in lieu of a PC.
>> Return to Annex E | Return to Top <<
E3. GMOCS RECOMMENDATION
If the PC or PPIS fails to submit a recommendation within 14 days, the GMOCS shall submit his/her recommendation.
>> Return to Annex E | Return to Top <<
E4. REVIEW AND COMMENT
Upon receipt of a recommendation resulting from Section E2 or Section E3, the GMOCS shall circulate the proposed Emergency Interim Standards Action and recommendation within seven days to the Standards Committee (StdC), the Managing Director of Technology, and the GMOCS for review and comment.
>> Return to Annex E | Return to Top <<
E5. PRESIDENT WILL ACT
A package composed of the proposed Emergency Interim Standards Action, recommendations resulting fromSection E2 or Section E3, and recommendations from the StdC Chair, Managing Director of Technology, and GMOCS, whether positive or negative, shall be submitted within 14 days of receipt by the GMOCS for the President’s consideration and decision.
>> Return to Annex E | Return to Top <<
E6. NOTIFICATIONS
The GMOCS shall issue notification of the President’s decision to the proposer, the Editor of the ASHRAE Journal, and ANSI and shall initiate implementation of the decision as appropriate.
>> Return to Annex E | Return to Top <<
REVISION HISTORY
|
Revision
|
Changes
|
BOD Approval Date
|
|
Original Release
|
The original edition of the Procedures for ASHRAE Standards Actions Under the ANSI Organization Method (PASA), dated June 30, 1994 superseded all previous documentation for communicating ASHRAE’s procedures as a basis for continuation (re-accreditation) under the ANSI Organization Accreditation Method.
|
June 29, 1994
|
|
A
|
The first revision was approved by the Board of Directors on February 2, 1995 and incorporated nine changes for clarifications and in response to comments resulting from ANSI public review of PASA.
|
February 2, 1995
|
|
B
|
On April 28, 1995, staff incorporated clarifying revisions to the figures in informative Appendix C and added a new Figure 6. ANSI reaccredited ASHRAE on August 4, 1995 based on this edition.
|
April 28, 1995
|
|
C
|
The third revision was approved by the ASHRAE Board of Directors on June 27, 1996 and incorporated twelve changes in response to recommendations in the ExSC Appeals Panel decision letter dated April 23, 1996, the draft ANSI Report of Audit of ASHRAE procedures and operations dated June 10, 1996, and the need for clarification.
|
June 27, 1996
|
|
D
|
The fourth revision included broadening the section on membership, by allowing for possibilities for organizational membership. Additionally, this revision incorporates some changes involving written responses to commenters and resolution of commenters. The ASHRAE Board of Directors approved this version January 27, 1999. ANSI reaccredited ASHRAE on May 7, 1999.
|
January 27, 1999
|
|
E
|
This revision includes changes to allow the newly approved Board Policy Committee for Standards to have oversight authority for certain project committees. It also deleted references to specific sections of ANSI procedures so that revision to PASA would not be necessary when section numbering in the ANSI procedures changed. The ASHRAE Standards ftp site (ftp.ashrae.org/stds-info) is now utilized as the means for advertising standards activities, in lieu of the ASHRAE Journal. The records retention policy has been clarified, and the references to formal Mediation Meetings have been removed. Finally, the appeals procedures were modified to more closely match the ANSI appeals procedures.
ANSI reaccredited ASHRAE on November 21, 2001.
|
June 29, 2000
|
|
F
|
Editorial revision of Section 6.2.1.2 made to reflect the oversight authority of the Board Policy Committee for Standards.
|
February 1, 2001
|
|
G
|
Editorial revision of Sections 4.1 and 6.2 made to reflect removal of Appendix C.
|
June 27, 2001
|
|
H
|
This revision included changes in Sections 6.2.1.2-6.2.1.3.2 to require letter ballot votes for publication approval by the Consensus Body. Appendix B3 was revised to further clarify the appeals process.
|
January 17, 2002
|
|
I
|
This revision includes changes in Sections 5, 6.3.6, 6.2.1.3, the Appendix A1 definition of “balance,” and the addition of Section 8 – Patents. Appendix B was revised to assign final approval of appeals to the Board Policy Committee for Standards.
|
June 27, 2002
|
|
J
|
This revision includes changes in sections 4.1, 6.2.1, 6.2.2, A1, and A2 to change the reference from Technical Evaluation Committees (TEC’s) to Technical Resource Groups (TRG’s). Changes were also made to sections 6.3.1.3 and 6.7 to remove the reference to the ASHRAE ftp site.
|
January 30, 2003
|
|
K
|
This revision includes the addition of a sentence to section 6.3.4.2 (Complaints of Inactions) that clarifies who addresses complaints.
|
July 3, 2003
|
|
L
|
This revision addresses the following issues: the clarification of ANSI requirements, removal of the Board Policy Committee for Standards (BPCS) oversight responsibility and changes to the appeals process.
|
July 1, 2004
|
|
M
|
This revision replaces language that was inadvertently deleted in the Nashville revision, to provide the provision to appoint the Appeals Panel Chair.
|
June 30, 2005
|
|
N
|
This revision includes revisions to section 4.3.2 (Joint Sponsorship) so that the GMOCS can negotiate terms of the joint sponsorship agreements. Changes were made to B6, B9.1, and B9.2 to clarify the appeals process. Section B9.2, The Hearing, was added to clarify the rules during the Appeals hearing.
|
January 26, 2006
|
|
O
|
This revision includes revisions to Section 4.3.2 (Joint Sponsorship) and removes approval by Technology Council and the BOD of the final negotiated cosponsorship agreement.
|
March 20, 2006
|
|
P
|
This revision includes adding the terms “including electronic communication” to Section 4.2.1.1, Section 6.4.3.2, and B9.1. This also includes revisions to 4.3.2 to clarify the language regarding Joint Sponsorship approval. Section 9, Commercial Terms and Conditions, was added. The definition of contact information was added to Appendix A. Revisions were made to Section B5 to add request for contact information and to limit the materials that are allowed in appeals.
|
June 29, 2006
|
|
Q
|
This revision includes adding the cm records retention policy to Section 6.3.8, adding Section 6.7, Interpretation Requests, and adding Annex C, Units Policy to PASA per the request of ANSI.
|
March 2, 2007
|
|
R
|
This revision in the Introduction section includes, moving part of the information to an informative forward.
|
October 24,2008
|
|
S
|
This revision in Section 3, changes Appendix to Annex.
|
October 24, 2008
|
|
T
|
This revision in Section 5 deletes text from ANSI Essential Requirements
|
October 24, 2008
|
|
U
|
This revision in Section 6.2.1, (Approval) includes Technology Council in the approval of publication drafts
|
October 24, 2008
|
|
V
|
This revision includes in Section 6.2.1.2, (Voting Requirements for Standards Actions), changing the vote from letter ballot to recorded votes, adding Technology Council and allowing the Board or its designees to vote.
|
October 24, 2008
|
|
W
|
This revision includes the deletion of Section 6.2.1.3
|
October 24, 2008
|
|
X
|
This revision includes in Section 6.2.2 (Modification of Standards) the addition of the need for a revision to a standard.
|
October 24, 2008
|
|
Y
|
This revision to Section 6.2.4 (Substantive Changes) deletes the entire section.
|
October 24, 2008
|
|
Z
|
This revision to Section 6.3.2 (Balance and Lack of Dominance) changes it to read like ANSI Essential Requirements 2008.
|
October 24, 2008
|
|
A
|
This revision to Section 6.3.3 (Interest Categories) deletes language in order to simplify the interest categories.
|
October 24, 2008
|
|
AB
|
This revision to section 6.3.4.1 (Appeals to BOD), includes the change from Appendix to Annex and includes the deletion of identifiable, realistic and readily available text.
|
October 24, 2008
|
|
AC
|
This revision to Section 6.3.6(Consideration of Comments Received) includes the addition of language specifying Public Review. Title reflects as Consideration of Public Review Comments Received and within the paragraph, “public review” was inserted.
|
October 24, 2008
|
|
AD
|
This revision to Section 6.4 (Consensus) was rewritten to require documentation that the consensus is in accordance with ANSI Essential Requirements and PASA.
|
October 24, 2008
|
|
AE
|
This revision to Section 6.5 (Criteria for Approval) modified letter (i) to change Appendix to Annex.
|
October 24, 2008
|
|
AF
|
This revision to Section 8 (Patents) was editorially modified. Removed the text “such” and “or guideline” from the first sentence.
|
October 24, 2008
|
|
AG
|
This revision to Appendix A includes:
- The deletion of ASHRAE Information Representative
- Modification of the definition of balance by deleting “dealing with product standards.”
- Modified definitions of continuous maintenance definition and interest category
- Modified definition of informative annex
- Modified interest categories definition; deleted the definition for all subcategories, user, producer and general
- Added a Method of Test Standard definition
- Modified the definition for normative annex
- Modified the definition for public review comment
- Deleted testing standard definition
- Modified unresolved commenter definition
- Deleted Section A3
|
October 24, 2008
|
|
AG
|
This revision to Appendix B includes:
- Appendix B2, deleted the availability of EISA’s to be appealed to the Board as this can be handled through the complaint process
- Appendix B3, modified who the appellant must be and how the vote should be casted
- Appendix B5.2, inserted the word “copies”
- Appendix 6, specified who the GMOCS should notify, public review commenters and/or a PC member who cast negative votes with reason(s) in relation to his/her vote on the consensus body
- Appendix B10, added language requiring that the Appeals Panel vote within 45 days of the hearing whether or not the appeal is upheld or denied.
|
October 24, 2008
|
|
AH
|
This revision to Section 4.1 includes the addition of the word publishing.
|
February 25, 2011
|
|
AI
|
This revision to Section 6 title includes the addition of language for discontinuing ASHRAE standards.
|
February 25, 2011
|
|
AJ
|
This revision to Section 6.3.6 includes language in the first paragraph straight from the PC MOP regarding information about the online comment database.
|
February 25, 2011
|
|
AK
|
The revision to Section 6.5 includes added and deleted language. The additions are from the ANSI Essential Requirements and are listed below:
- Notice of the development process for the standard was provided to ANSI in accordance with PINS or its equivalent
- Identification of all unresolved negative views and objections, with names of the objector(s), and a report of attempts toward resolution
- The standard is within the purpose and scope approved by the Standards Committee
- ….and if duplication exists, there is a compelling need for the standard
- ANSI’s policy on commercial terms and conditions is met if applicable
The deletion of Section 6.5 includes:
- StdC prohibitions of commercial references, exclusive use of proprietary materials, or prescribing a proprietary agency for quality control or testing are met, and
|
February 25, 2011
|
|
AL
|
The revision to Section 6.7, 6.7.1 and 6.7.2 includes the addition of language regarding the criteria for project discontinuance. The previous sections 6.7 and 6.8 been renumbered due to this addition to 6.8 and 6.9 respectively.
|
February 25, 2011
|
|
AM
|
Section 6.10 was added, it includes the word writing to clearly specify the method in which interpretation requests are received and responded to. It also editorially corrects the spelling of the word revision.
|
February 25, 2011
|
|
AN
|
The revision of Section 8 deletes the entire paragraph and adds a blanket statement “ASHRAE agrees to comply with the Patent Policy as stated in the ANSI Essential Requirements.”
|
February 25, 2011
|
|
AO
|
The revision of Section 9 deletes the entire paragraph and adds a blanket statement “ASHRAE agrees to comply with the Commercial Terms and Conditions Policy as stated in ANSI Essential Requirements.”
|
February 25, 2011
|
|
AP
|
This revision adds a Section 10 which includes information regarding PINS. It states” At the initiation of a project to develop or revise and ASHRAE American National Standard, ASHRAE shall use the ANSI Project Initiation Notification System (PINS) form.
|
February 25, 2011
|
|
AQ
|
The revision to Annex A includes deletions of definitions. Deleted definitions include:
- ASHRAE Alternate – a designated alternate to the ASHRAE Representative appointed by the Standards Committee of another organization and empowered to vote on behalf of ASHRAE on matters dealing with standards. (See ASHRAE Representative)
- ASHRAE Representative – an official representative of ASHRAE appointed by the Standards Committee to a committee of another organization and empowered to vote on behalf of ASHRAE on matters dealing with standards.
- Contact information – name, affiliation, mailing address, email address, daytime telephone numbers and facsimile numbers
- Independent substantive change – a substantive change that is independent of any other substantive change and that does not significantly affect any other requirement in the standard. See substantive change.
- Method of Test Standard – a standard setting forth the methods of measuring capacity or other characteristics of a specified material, component, or system, together with a specification of instrumentation, procedure, and calculations.
- TC Technical Committee appointed by the TAC
|
February 25, 2011
|
|
AR
|
The revision to Section A2 includes the addition of the terms below:
- BOD Board of Directors
- PPIS Planning, Policy and Interpretations Subcommittee
- SCD Standards Committee Document
- SPLS Standards Project Liaison Subcommittee
- SRS Standards Reaffirmation Subcommittee
- TPS Title, Purpose and Scope
The revision to Section A2 also includes a deletion of the terms below:
- TC/TG/TRG a TC, TG or TRG
- TC Technical Activities Committee
|
February 25, 2011
|
|
AS
|
The revision to Section 6.2.1 removes one of the approving bodies, Technology Council.
|
February 25, 2011
|
|
AT
|
The revision to Section 6.2.1.2 removes Technology Council and clarifies comment resolution attempts. It also notes that comments received that are not relevant to the proposed standards action under consideration shall be treated as a new proposal.
|
February 25, 2011
|
|
AU
|
The revision to Section 6.5 ensures that all procedures were followed and it provides the procedures for documenting consensus.
|
February 25, 2011
|
|
AV
|
This revision adds a sentence to Section 10 which states: Comments will be addressed in accordance with clause 2.5 of the current version of the ANSI ER.
|
February 25, 2011
|
|
AW
|
The revision to Annex A adds definitions for informative language and notes. It also updates the current definitions; continuous maintenance, informative annex, normative annex, shall, should, standard, and unresolved public review commenter.
|
February 25, 2011
|
|
AX
|
The revision to Section B9.1 decreases the notice time to 30 days for appeal hearings if the appeal hearing is being held via conference call.
|
February 25, 2011
|
|
AY
|
The revision to Section 4.2.1.1makes PASA consistent with ASHRAE’s Project Committee Manual of Procedures.
|
May 15, 2012
|
|
AZ
|
The revision to Section 6.3.5 makes PASA consistent with ANSI ER.
|
May 15, 2012
|
|
BA
|
The revision to Annex B would provide a larger pool of members to expeditiously hear appeals.
|
May 15, 2012
|
|
BC
|
The revision to Section 6.2.1.2 brings PASA in line with StdC MOP and StdC Reference Manual.
|
June 27, 2012
|
|
BD
|
The revision to Section 6.3.6 is a direct result from the ExSC comments during the last public review of PASA. Procedures are included from when a Project Committee makes substantive changes to the draft after consideration of comments or when new information is received.
|
June 27, 2012
(PASA Reaccredited 10/12/12)
|
|
BE
|
Editorial change to Section 6.3.6.2, deleted last part of the sentence that states “in accordance with the continuous maintenance schedule.”
|
September 27, 2013
|
|
BF
|
The revision to Section 4 adds additional information regarding Standards Subcommittees and its function as well as membership, most of this information was pulled from the PC MOP per ANSI’s request to streamline our documents.
|
PASA Reaccredited
October 22, 2014
|
|
BG
|
The revision to Section 7.2.1adds information regarding the different types of Public Review and the publication approval level requirements. Section 7.2.4 also clarifies the voting requirements for Standards Actions, 7.4.2 and 7.4.3 clarifies lack of dominance and balance and interest categories.
Section 7.6 clarifies criteria for approval. Section 7.8 allows SPLS and StdC to approve waivers for discontinuing a project. Section 7.11 supplies additional guidance for interpretation requests. PPIS can approve interpretations to the Standards Development Procedures.
|
PASA Reaccredited
October 22, 2014
|
|
BH
|
Annex A and A2 was revised to include additional definitions. Annex B was revised to clarify appealable matters, content of the appeal, filing fee, notification procedures, and conflict of interest. Annex C (Complaints of Actions or Inactions by the StdC, its Subcommittees or PC’s) and Annex E (Emergency Interim Standards Action) were added into PASA.
|
PASA Reaccredited
October 22, 2014
|
|
BI
|
Annex A - editorial updates were made to the definitions: notes and code language document. “Notes” is now “Informative Notes”.
|
November 10, 2014
|
|
BJ
|
Section 4.2.2.6 clarified SRS will comply with ANSI requirements of openness, balance and due process. Section 7.11 adds the Chair’s designee can also issue official interpretations of standards. Section 11 Antitrust Policy was added to PASA. Annex A, informative notes was clarified. Annex B removes the option for technical appeals.
|
PASA Reaccredited
April 29, 2015
|
|
BK
|
This revision to PASA includes the following revisions:
- Standards Reaffirmation Subcommittee (SRS) membership – This change clarifies that SRS membership is appointed in a different manner than normal Project Committee (PC) membership.
- Voting requirements – This change overhauls the voting requirements section to ensure the requirements are clear, especially with respect to responding to negative votes with a reason.
- What to do with comments on a subsequent public review – This change is in response to a prior PASA interpretation and clarifies that if there is a full subsequent public review then formal responses do not need to be approved for the original full public review. This is consistent with our current practice and ANSI Essential Requirements.
- Project Discontinuation – This change clarifies the procedures for discontinuing a project. The current procedures indicate in an unclear manner when a discontinuance is automatic and when other committees (SRS and Standard Project Liaison Subcommittee (SPLS)) need to recommend formal action.
- Annex A: Definitions Non-substantive change – This change removes/edits the definition of non-substantive change as to ensure that a change (as defined) is either substantive or non-substantive. Right now there’s a gap where it could be neither. Clarified definitions for informative annex and standards action.
- Annex B: There are currently some unclear provisions in the appeals procedures. These revisions clarify what steps should be taken and defines timelines.
- Annex C: Complaint of actions/inactions –This change modifies the procedures for complaints for action/inaction in an attempt to both streamline the procedures and reduce the potential for frivolous complaints.
|
PASA Reaccredited
May 1, 2018
|
|
BK
|
This revision to PASA includes the following revisions:
- Standards Reaffirmation Subcommittee (SRS) membership – This change clarifies that SRS membership is appointed in a different manner than normal Project Committee (PC) membership.
- Voting requirements – This change overhauls the voting requirements section to ensure the requirements are clear, especially with respect to responding to negative votes with a reason.
- What to do with comments on a subsequent public review – This change is in response to a prior PASA interpretation and clarifies that if there is a full subsequent public review then formal responses do not need to be approved for the original full public review. This is consistent with our current practice and ANSI Essential Requirements.
- Project Discontinuation – This change clarifies the procedures for discontinuing a project. The current procedures indicate in an unclear manner when a discontinuance is automatic and when other committees (SRS and Standard Project Liaison Subcommittee (SPLS)) need to recommend formal action.
- Annex A: Definitions Non-substantive change – This change removes/edits the definition of non-substantive change as to ensure that a change (as defined) is either substantive or non-substantive. Right now there’s a gap where it could be neither. Clarified definitions for informative annex and standards action.
- Annex B: There are currently some unclear provisions in the appeals procedures. These revisions clarify what steps should be taken and defines timelines.
- Annex C: Complaint of actions/inactions –This change modifies the procedures for complaints for action/inaction in an attempt to both streamline the procedures and reduce the potential for frivolous complaints.
|
PASA Reaccredited
May 1, 2018
|
|
BL
|
Editorial: Updated Section 7.11 to reflect new title; Assistant Manager of Research & Technical Services to Manager of Technical Services.
|
June 12, 2018
Editorial
|
|
BM
|
Editorial: Added “working” in first paragraph to detail the amount of time to send notification of a right to appeal. Keeps it consistent with the document.
|
July 17, 2018
Editorial
|
|
BN
|
Editorial: Updated the footer with correct Reaccredited dates
|
August 20, 2018
Editorial
|
|
BO
|
Editorial: Revise Section 7.2.6.1 to refer to Section 7.2.4.2 instead of 7.4.2.1; Revise Section 7.4.4.1 to remove “substantive technical,” as ASHRAE’s appeals policy states that ASHRAE will only hear procedural appeals; Revise Section 7.4.6 to add “and ANSI” before Standards Actions; 7.11 added a hyperlink to the full interpretation policy document
|
PASA Reaccredited
December 19, 2018
|
|
BP
|
This revision to PASA includes the following:
- PASA 4.2.2.6, Standards Reaffirmation Subcommittee – this proposed change allows SRS membership approval to stop at the Standards Committee Chair; removing Technology Council is an effort to streamline approval levels.
- PASA 4.3.1, Project Committees – added Guideline Project Committees and Standing Guideline Project committees.
- PASA 4.3.8, Removal for Cause and PASA 4.3.9, Removal for Cause Initiated by SPLS – currently we have a Sample Letter that details this information; this change moves the requirement in the sample letter to the procedures.
- PASA 7.2.2, Publication Approval – this change allows fast track approval of any publication, including policy-level documents, that have no unresolved objections.
- PASA 2, Scope PASA 4, Approval of Proposed Standards, PASA 7, Criteria for Approval, Withdrawal and Discontinuance of ASHRAE Standards, PASA A1 Definitions, PASA Annex B: Appeals of Board of Directors; Standards Actions or Inactions and PASA Annex E: Procedures -Emergency Interim Standards Action - PASA’s current language isn’t clear how Guideline Project Committees (GPC’s) and Standing Guideline Project Committees (SGPC’s) should operate. The proposed change updates PASA by including language in appropriate locations in PASA that allows the users to readily identify and comply with the necessary GPC and SGPC procedures. In addition, grammatical corrections were made.
- PASA 7.2.7, Negative Votes on Letter Ballots of PCs and Project Subcommittees – this change reduces time frame to 7 calendar days for voters to reaffirm their votes or change their votes or to vote during a reconsideration period.
- PASA 7.2.4.2, Numerical Requirements for Standards Action Votes, PASA 7.4.3, Balance and Interest Categories and PASA, Definitions – it was determined the terms “consensus body” and “project committee” are used interchangeably and inconsistently in PASA, the proposed change to solely use “project committee” provides a resolution to the issue.
- PASA 7.3, Maintenance of Standards – procedures were added to address situations where an SSPC, SGPC, SPC or GPC wants to issue an addendum to a Periodic Maintenance standard or guideline.
- PASA (entirety) – the term “standards committee document” and “SCD” is used interchangeably and becomes confusing, the proposed change “standards, guidelines, or portions thereof” provides a resolution to this issue. In addition, grammatical corrections were made.
- Editorial changes: The following sections were updated to match the requirements in Section 7.2.2: Sections 7.2.1.2, Normal Track Public Review (NTPR); 7.2.1.3, Fast Track Public Review (NTPR), Definitions: fast track and normal track; 7.2.4.6, Approval of Standards Actions by Approval Bodies
|
PASA Reaccredited
4/21/2020
|
|
BQ
|
PASA updated to include the editorial updates made to the 2021 ANSI Essential Requirements version. “Edits reflect a consistent use of “directly and materially interested parties” and with respect to appeals and withdrawal -for-cause requests, “directly and materially interested parties who have been or will be adversely affected” by the ANS at issue.”
|
PASA Editorial Update
2/9/2021
|
|
BR
|
PASA section 4.3.6 updated to match Section 4.3.5. Includes “Subcommittee chair” in the list of those who cannot serve if they are a representative or alternate.
|
PASA Editorial Update
8/4/2021
|
|
BS
|
PASA section 4.2.2.6 changed the word “minor” to non-substantive in the first sentence. In the last sentence, changed the words “reaffirm” to “reaffirmation”, “revise” to “revision” and “withdraw” to “withdrawal”.
Per changes made in 4/21/20 PASA edition, added “guideline” to SRS responsibilities, it should reflect both standards or guidelines.
|
PASA Editorial Update
3/31/2022
|
|
BT
|
PASA section 4.3.6 – moved text discussing organizational members from this section to PASA section 4.3.8.
|
PASA Editorial Update
3/31/2022
|
|
BU
|
PASA section 5.2 first sentence, second paragraph, changed “organizations” to “organization”.
|
PASA Editorial Update
3/31/2022
|
|
BV
|
This revision to PASA includes:
4.1 establishes Standards Committee as the final approval body.
4.3.1 deleted “non policy level” and moved approval of members to a PC from Standards Committee to SPLS.
4.3.4 added verbiage including an additional function for the use of subcommittees.
5.2 removed approval of joint sponsorship from the Board to Technology Council.
7.2.1.1 moved approval of APR from SPLS liaison and SPLS Chair to SPLS Liaison.
7.2.1.3 clarified the criteria for fast track
7.2.2 moved publication approval with unresolved objectors or threats of legal action from the Board to Standards Committee and will be reported as an information item the Technology Council and the Board.
7.2.3 removed quorum requirements from Tech Council and the Board of Directors.
7.2.2 moved publication approval with unresolved objectors or threats of legal action from the Board to Standards Committee and will be reported as an information item the Technology Council and the Board.
7.2.3 removed quorum requirements from Tech Council and the Board of Directors.
7.2.4.2 changes the numerical requirements for standards action votes.
PASA Annex A: Definitions, Abbreviations, Acronyms and Classifications
Informative Annex and Informative Appendix definition.
PASA Annex B: lowers approval from the BOD to Standards Committee.
*These changes streamline and clarifies our approval process.
|
PASA Reaccredited:
1/27/2023
|
|
BW
|
Editorial Change - PASA 7.2.4.2 Numerical Requirement for Standards Action Votes – removed “excluding abstentions”. This was mathematically incorrect in process.
|
Staff
|
|
BX
|
Section 4.2 Standards Committee Membership (4.2.2, Standards Committee Subcommittee, International Standards Advisory Subcommittees (ISAS), 4.2.2.2, Intersociety Liaison Subcommittee (ILS) – removed these subcommittees from PASA.
Section 4.2.2.6 Standards Reaffirmation Subcommittee (SRS) – added SRS’ international standards responsibility.
Annex B – clarified our notification process and the process for adjudicating an appeal without a hearing
|
PASA Reaccredited
May 24, 2024
|
|
BY
|
Annex E2 updated to reference the correct section 7.10.
|
Staff
|
|
BZ
|
Sec 7.2.7 header was revised to remove “and Subcommittees”. This was a typo and does not align with current practice.
|
Staff
|
|
CA
|
Annex B was updated to clarify timelines, changed “working” days to “business days” throughout.
|
Staff
|
|
CB
|
Annex A: Definitions, User was updated to remove “other than household use”.
|
TechC
|
|
CC
|
Section 2 Scope, Section 4.1 Responsibility, Section 4.2.2.4 Standards Reaffirmation Subcommittee, Section 7.3, Maintenance of Standards and Guidelines, New Section 7.3.1 Stabilized Maintenance, Section 7.4.7, Consideration of Standards and Proposals, Section 7.4.8, Records, Section 7.8.1, Project Discontinuation Due to Lack of Membership, Annex A: Definitions , Annex B8.2. – PASA updated to include an option of stabilized maintenance, voting sections (handling negative votes on letter ballots) were clarified, verbiage matching the ANSI ER Criteria for Approval of Standards and clarity provided on ineligible panel members for appeals. There were also some editorial corrections made.
|
PASA Reaccredited
TBD
|
|
DD
|
Editorial updates were made to PASA (spelling and formatted for html purposes).
|
Staff
|