Artificial intelligence (AI) policy: ASHRAE prohibits the entry of content from any ASHRAE publication or related ASHRAE intellectual property (IP) into any AI tool, including but not limited to ChatGPT. Additionally, creating derivative works of ASHRAE IP using AI is also prohibited without express written permission from ASHRAE.

Close
logoShaping Tomorrow's Built Environment Today

Interpretations for Standard 90.1-2019

Share This

NOTE: All documents linked from this page are in pdf_icon.png PDF-format.

pdf_icon.png Interpretation 90.1-2019-1 -  June 1, 2020 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6 and Table 6.8.1-16, regarding minimum efficiency requirements for heat pump and heat recovery chiller packages.)

pdf_icon.png Interpretation 90.1-2019-2 -  June 1, 2020 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6 and Table 6.8.1-16, regarding minimum efficiency requirements for heat pump and heat recovery chiller packages.)

pdf_icon.png Interpretation 90.1-2019-3 -  June 5, 2020 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section G3.1.3.7, regarding Appendix G type and number of baseline chillers.)

pdf_icon.png Interpretation 90.1-2019-4 -  June 5, 2020 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Tables 9.4.2-2 and G3.6, regarding Appendix G baseline building exterior lighting.)

pdf_icon.png Interpretation 90.1-2019-5 -  March 31, 2021 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Sections 6.5.3.5 and 6.5.3.5.1, regarding supply air temperature reset.)

pdf_icon.png Interpretation 90.1-2019-6 -  June 9, 2021 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 6.5.2, regarding the application of Section 6.5.2 to hospital zones.)

pdf_icon.png Interpretation 90.1-2019-7 -  October 13, 2021 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 5.5.4.1, regarding the determination of WWR for use with Tables 5.5-0 to 5.5-8.)

pdf_icon.png Interpretation 90.1-2019-8 -  October 13, 2021 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Table G3.1 #5, Baseline Building Performance column, item (c), regarding Appendix G baseline fenestration modeling requirements.)

pdf_icon.png Interpretation 90.1-2019-9 -  February 6, 2023 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 3, regarding the definition of a conditioned space – cooled space.)

pdf_icon.png Interpretation 90.1-2019-10 -  February 6, 2023 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019 Appendix G requirements applicable to computer rooms.)

pdf_icon.png Interpretation 90.1-2019-11 – June 24, 2023 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section G3.1.2.5 Exception1, Baseline Building Performance column, item (c), regarding calculation of the average design capacity.)

pdf_icon.png Interpretation 90.1-2019-12 – June 26, 2023 (Refers to ANSI/ASHRAE/IES Standard 90.1-2019 Section 3 definition of indirectly conditioned spaces.)

pdf_icon.png Interpretation 90.1-2019-13 – October 7, 2023 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section 5.4.1, regarding insulation and Section 11.2(a) and Appendix G, G1.2.1(a).)

Interpretation 90.1-2019-14 – January 30, 2024 (Refers to the requirements presented only in ANSI/ASHRAE/IES Standard 90.1-2019, Section 3.2, 4.1.2, 4.2.1.3, and 5.1.3, regarding roof replacement.)

Interpretation 90.1-2019-15 – January 30, 2024 (Refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2019, Section G3.1.2.6 Exception 2, regarding determining if the proposed design includes an economizer.)

Interpretation 90.1-2019-16 – June 6, 2024 (Refers to ANSI/ASHRAE/IES Standard 90.1-2019, Section 9.1.4, regarding lighting equipment wattage for calculating lighting power.)

Close